Laserfiche WebLink
Summary of Options <br />Type Ultimate Demand Scenario Options <br />Replace groundwater supplies Hugo 1 •Replace 6 permits with demand reductions (SW 2a) <br />•Replace 7 permits (SW 3 and SW 5 ) <br />•Replace 9 permits (SW 4) <br />Replace groundwater supplies Hugo 2 •Replace 9 permits (SW 4-2) <br />•Replace 7 permits with demand reductions (SW 3-2) <br />•Hugo 1 options with expanded Hugo area supplied <br />with surface water <br />Augmentation Hugo 1 or Hugo 2 •Augmentation trigger elevation <br />Combine surface-water supply with <br />injection of treated wastewater <br />Hugo 1 •Replace 6 permits (2 options) with 1 mgd injection <br />(SW 2, SW 6) <br />•Replace 4 permits with 2 mgd injection (SW 7) <br />•Replace < 6 permits with 1 mgd injection? <br />Combine surface-water supply with <br />injection of treated wastewater <br />Hugo 2 Not tested, likely several options