Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br />Date: April 23, 2025 <br /> <br /> <br />To: Sophia Jensen, Senior City Planner Re: Primrose School CUP <br /> Jason Stopa, Community Development Director <br /> Marty Powers, Public Works Director <br /> Nate Stanley, City Engineer <br /> Chad Isakson, Assistant City Engineer <br />From: Jack Griffin, Sr. Project Manager <br /> <br /> <br />An engineering review has been completed for the Primrose School CUP application received on April 11, <br />2025. This review consisted of the following documentation: <br />· Primrose School Civil Site Plans dated April 10, 2025. <br />· Stormwater Compliance Memo dated April 4, 2025. <br />· ALTA Survey dated January 6, 2025. <br /> <br /> <br />STATUS/FINDINGS: Approval of the Primrose School CUP must be contingent upon the Civil Site Plans <br />being reviewed and approved by the City, once the Bridgewater Village Subdivision Improvements have <br />been constructed and accepted by the City. <br /> <br />The Civil Site Plans submitted with this application appear substantially compliant with the intended <br />Bridgewater Village infrastructure improvements. However, these improvements are not constructed at <br />the time of this application and are subject to change. The Civil Site Plans must be revised to reflect the <br />as-built conditions of the Bridgewater Village infrastructure improvements and resubmitted for City <br />review. <br /> <br /> <br />PRIMROSE SCHOOL CIVIL SITE PLANS <br />1. The ALTA Survey must be revised and resubmitted once the City approved as-bult conditions are <br />available for the Bridgewater Village infrastructure improvements. <br />2. All Civil Site Plan sheets must be revised to reflect the City approved as-built conditions for <br />Bridgewater Village. All proposed improvements must be revised to connect into the as-built <br />infrastructure components. <br />3. The Stormwater Compliance memo is incomplete. Stormwater reuse is a requirement of the <br />Bridgewater Village subdivision including all commercial lots. Therefore, the Primrose School CUP <br />approval must be contingent upon the implementation of Stormwater Reuse in perpetuity, and in <br />accordance with the Bridgewater Village approved Stormwater Management Plan. <br />4. G-001. Add plan note to identify the standard of care guideline for the collection and depiction of <br />existing subsurface utility data per CI/ASCE 38-02. <br />5. G-001. Add plan note that “All construction parking and staging, including the loading and <br />unloading of equipment and supplies, and including storage of materials, during the construction