My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - Primrose Day care CUP
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-03-25
>
#09 - Primrose Day care CUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:09:32 AM
Creation date
8/15/2025 10:07:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br />Date: April 23, 2025 <br /> <br /> <br />To: Sophia Jensen, Senior City Planner Re: Primrose School CUP <br /> Jason Stopa, Community Development Director <br /> Marty Powers, Public Works Director <br /> Nate Stanley, City Engineer <br /> Chad Isakson, Assistant City Engineer <br />From: Jack Griffin, Sr. Project Manager <br /> <br /> <br />An engineering review has been completed for the Primrose School CUP application received on April 11, <br />2025. This review consisted of the following documentation: <br />· Primrose School Civil Site Plans dated April 10, 2025. <br />· Stormwater Compliance Memo dated April 4, 2025. <br />· ALTA Survey dated January 6, 2025. <br /> <br /> <br />STATUS/FINDINGS: Approval of the Primrose School CUP must be contingent upon the Civil Site Plans <br />being reviewed and approved by the City, once the Bridgewater Village Subdivision Improvements have <br />been constructed and accepted by the City. <br /> <br />The Civil Site Plans submitted with this application appear substantially compliant with the intended <br />Bridgewater Village infrastructure improvements. However, these improvements are not constructed at <br />the time of this application and are subject to change. The Civil Site Plans must be revised to reflect the <br />as-built conditions of the Bridgewater Village infrastructure improvements and resubmitted for City <br />review. <br /> <br /> <br />PRIMROSE SCHOOL CIVIL SITE PLANS <br />1. The ALTA Survey must be revised and resubmitted once the City approved as-bult conditions are <br />available for the Bridgewater Village infrastructure improvements. <br />2. All Civil Site Plan sheets must be revised to reflect the City approved as-built conditions for <br />Bridgewater Village. All proposed improvements must be revised to connect into the as-built <br />infrastructure components. <br />3. The Stormwater Compliance memo is incomplete. Stormwater reuse is a requirement of the <br />Bridgewater Village subdivision including all commercial lots. Therefore, the Primrose School CUP <br />approval must be contingent upon the implementation of Stormwater Reuse in perpetuity, and in <br />accordance with the Bridgewater Village approved Stormwater Management Plan. <br />4. G-001. Add plan note to identify the standard of care guideline for the collection and depiction of <br />existing subsurface utility data per CI/ASCE 38-02. <br />5. G-001. Add plan note that “All construction parking and staging, including the loading and <br />unloading of equipment and supplies, and including storage of materials, during the construction
The URL can be used to link to this page
Your browser does not support the video tag.