My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - Well 2 PFAS WTP Change Order 1
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-17-25
>
#09 - Well 2 PFAS WTP Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:13:56 AM
Creation date
8/15/2025 10:13:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANTEC – 2/28/2025 WORK CHANGE DIRECTIVE 03 <br />173420153 Lake Elmo Well No. 2 PFAS WTP PAGE C-940- 1 <br />SECTION C-940 – WORK CHANGE DIRECTIVE 03 <br />Owner: City of Lake Elmo, Minnesota Owner’s Project No.: 2023.115 <br />Engineer: Stantec Engineer’s Project No.: 173420153 <br />Contractor: Magney Construction Contractor’s Project No.: 616 <br />Project: Well No. 2 PFAS WTP <br />Contract <br />Name: <br />Date Issued: 3/24/2025 <br />Effective Date of Work Change <br />Directive: 3/24/2025 <br />Contractor is directed to proceed promptly with the following change(s): <br />Description: <br />Replace smooth face block with split face block. Addition of block at location of removed <br />hollow core plank. <br />Attachments: <br />RFP 003 – Masonry Changes (provided by Magney) <br />RFI 004 – North and South Smooth vs Split Face Block <br />Purpose for the Work Change Directive: <br />The upper course of block was originally cut and needs to be replaced. The course below it <br />had flashing nailed into the block at frequent intervals. The replacement of the plain block is <br />needed to account for the hollow core plank that was removed. <br />Directive to proceed promptly with the Work described herein, prior to agreeing to change in <br />Contract Price and Contract Time, is issued due to: <br />☐ Non-agreement on pricing of proposed change. ☒ Necessity to proceed for schedule or other <br />reasons. <br />Estimated Change in Contract Price and Contract Times (non-binding, preliminary): <br />Contract Price: $5,040.00 increase <br />Contract Time: 0 days no change <br />Basis of estimated change in Contract Price: <br />☒ Lump Sum ☐ Unit Price ☐ Cost of the Work ☐ Other <br /> Recommended by Engineer Authorized by Owner <br />By: Brian Lintgen, Stantec Adam Swanepoel, City of Lake Elmo <br />Title: Project Manager Assistant Public Works Director <br />Date: 3/24/2025 3/24/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.