My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - Well 2 PFAS WTP Change Order 1
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-17-25
>
#09 - Well 2 PFAS WTP Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:13:56 AM
Creation date
8/15/2025 10:13:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Information No. 004 <br />Lake Elmo – Water Treatment Plant <br />General Contractor: <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />Engineer: <br />Stantec <br />Date Created: 2/26/25 <br />Author: Peter Company: Magney Construction, Inc. <br />Reference: North and South Smooth vs Split Face Block <br />Drawing Number: Pics Specification Section: <br />Question: Date Required: 2/28/2025 <br />The North side bump out on the Tank Room and the South side of the existing generator room have a course of smooth <br />face block for the soffit to attach to. It appears that this course and the course above it need to get removed and replaced <br />with courses of Rock/Split Face Block to match the East and West Walls. Is this correct? How should we proceed? <br />Answer: <br />Date Answered: <br />Answered by: <br />the existing drawings indicated all CMU to be rock-faced. The smooth block should be replaced with <br />rock-faced block so all walls match. <br />Prior to doing any replacement, a cost for this will need to be provided for review and approval by <br />the Owner. <br />Bruce Paulson <br />Stantec <br />February 27, 2025
The URL can be used to link to this page
Your browser does not support the video tag.