My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - Well 2 PFAS WTP Change Order 1
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-17-25
>
#09 - Well 2 PFAS WTP Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:13:56 AM
Creation date
8/15/2025 10:13:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Information No. 009 <br />Lake Elmo – Water Treatment Plant <br />General Contractor: <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />Engineer: <br />Stantec <br />Date Created: 4/9/25 <br />Author: Peter Nordang Company: Magney Construction, Inc. <br />Reference: Exhaust Duct on Existing Roof <br />Drawing Number: Specification Section: <br />Question: Date Required: 4/11/25 <br />It appears that this exhaust duct needs to get moved as it’s too close to the new exterior wall. <br />How would you like to proceed? <br />Answer: <br />Date Answered: <br />Answered by: <br />4/10/25 <br />Christian Swor <br />The exhaust duct from the chemical room will have to be moved 3 feet to the <br />North. Two new 90 degree transitions with turning vanes and some new <br />ductwork as well as roof patching will be required. See accompanying partial <br />floor plan.
The URL can be used to link to this page
Your browser does not support the video tag.