Laserfiche WebLink
Request for Information No. 009 <br />Lake Elmo – Water Treatment Plant <br />General Contractor: <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />Engineer: <br />Stantec <br />Date Created: 4/9/25 <br />Author: Peter Nordang Company: Magney Construction, Inc. <br />Reference: Exhaust Duct on Existing Roof <br />Drawing Number: Specification Section: <br />Question: Date Required: 4/11/25 <br />It appears that this exhaust duct needs to get moved as it’s too close to the new exterior wall. <br />How would you like to proceed? <br />Answer: <br />Date Answered: <br />Answered by: <br />4/10/25 <br />Christian Swor <br />The exhaust duct from the chemical room will have to be moved 3 feet to the <br />North. Two new 90 degree transitions with turning vanes and some new <br />ductwork as well as roof patching will be required. See accompanying partial <br />floor plan.