Laserfiche WebLink
Lake Elmo Well 2 PFAS Water Treatment Plant <br />Change Order No. 1 - Attachment A <br />No. Change Reason Add Deduct Price Determined <br />1.1 Rehabilitate existing well discharge head in place of <br />providing a new one. <br />Cost and time savings to rehabilitate the existing well discharge head <br />instead of providing a new one. $ (5,850.00) $ (5,850.00) <br />1.2 Replace smooth face block with split face block. Addition <br />of block at location of removed hollow core plank. <br />The upper course of block was originally cut and needs to be replaced. <br />The course below it had flashing nailed into the block at frequent <br />intervals. The replacement of the plain block is needed to account for the <br />hollow core plank that was removed. $ 5,040.00 $ 5,040.00 <br />1.3 Remove and relocate chlorine room exhaust ventilation <br />to avoid conflict with the revised building. <br />The chlorine room exhaust vent needs to be relocated as it is too close <br />to the new exterior wall. $ 2,720.41 $ 2,720.41 <br />1.4 Add attic access to the treatment room to allow for <br />insulation/building inspections and future access. Add attic access. $ 974.63 $ 974.63 <br />1.5 Remove and replace existing copper house water line <br />that was cracked. Replace and reconfigure house water line. $ 890.18 $ 890.18 <br />Totals: $ 9,625.22 $ (5,850.00) <br />Net Total: $ 3,775.22