My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-25 The Fresh Newsletter
LakeElmo
>
Communications
>
Newsletter - The Fresh
>
2025 The Fresh Newsletters
>
08-15-25 The Fresh Newsletter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2025 2:28:04 PM
Creation date
8/18/2025 2:28:02 PM
Metadata
Text box
ID:
1
Creator:
METRO-INET\JULIE.JOHNSON
Created:
8/18/2025 2:28 PM
Modified:
8/18/2025 2:28 PM
Text:
https://www.lakeelmo.gov
ID:
2
Creator:
METRO-INET\JULIE.JOHNSON
Created:
8/18/2025 2:28 PM
Modified:
8/18/2025 2:28 PM
Text:
https://www.washingtoncountymn.gov/2301/Phase-3-Current-Phase
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The valves are strategically placed to isolate areas of the main in <br />case a main break or leak occurs. Without these valves in good <br />working condition, large areas of the system would have to be shut <br />down instead of isolating small segments of the water <br />main. Residents may experience a loss of water pressure for a short <br />period. Should you see Public Works staff exercising valves, please <br />slow down to prevent injury or damage to equipment. <br />Reid Park Parking Lot Construction <br />The Reid Park parking lot will be under construction starting August <br />18. The project will extend the existing sidewalk from the park to 30th <br />Street, add a new trail, lay down a new asphalt surface, increase <br />parking spaces, and install concrete curbs to manage stormwater. <br />Access to the park will be limited to pedestrians during the week of <br />August 25, and the project is expected to be completed by the end of <br />September. <br />It's Here! <br />Our much-anticipated new website is finally here! Visit LakeElmo.gov <br />and take a virtual tour. We hope you love it as much as we do! <br />SUMMER ROAD PROJECTS <br />10th Street East of Palmer Drive to Manning Ave. To <br />Close August 18 for Three Weeks <br />10th Street east of Palmer Drive will close for three weeks starting <br />August 18th. This is the same closure that was announced a couple <br />of weeks ago, but the contractor encountered groundwater issues <br />and had to revise the plan to finish the school utility extension work. <br />Washington County / Lake Elmo Summer Road Projects <br />The Washington County Inwood Avenue (CSAH <br />13) road project is finished and is now open in <br />Washington County will begin Phase 3 <br />of the County Highway 15 (Manning <br />Avenue) August 18.
The URL can be used to link to this page
Your browser does not support the video tag.