Laserfiche WebLink
PARTIAL PAY ESTIMATE NO. 5 (FINAL) <br />2023 TRAIL IMPROVEMENTS <br />CITY OF LAKE ELMO, MINNESOTA <br />PROJECT NO. 2022.117 <br />QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />1 LS 1 <br />$23,500.00 $23,500.00 0.00 $0.00 1.00 $23,500.00 <br />2 LS 1 <br />$2,900.00 $2,900.00 0.00 $0.00 1.00 $2,900.00 <br />3 LF 5560 <br />$1.00 $5,560.00 0.00 $0.00 5,719.00 $5,719.00 <br />4 EA 13 <br />$150.00 $1,950.00 0.00 $0.00 16.00 $2,400.00 <br />5 EA 7 <br />$818.28 $5,727.96 0.00 $0.00 24.00 $19,638.72 <br />6 EA 4 <br />$204.57 $818.28 0.00 $0.00 6.00 $1,227.42 <br />7 SY 960 <br />$5.11 $4,905.60 0.00 $0.00 840.00 $4,292.40 <br />8 SY 1040 <br />$5.11 $5,314.40 0.00 $0.00 840.00 $4,292.40 <br />9 LS 1 $10,228.45 $10,228.45 0.00 $0.00 1.00 $10,228.45 <br />10 CY 600 <br />$16.24 $9,744.00 9.00 $146.16 549.00 $8,915.76 <br />11 EA 8 <br />$1.00 $8.00 0.00 $0.00 0.00 $0.00 <br />12 HOUR 14 <br />$160.45 $2,246.30 0.00 $0.00 4.00 $641.80 <br />13 SY 3430 <br />$1.00 $3,430.00 260.00 $260.00 2,251.00 $2,251.00 <br />14 SY 2940 <br />$0.50 $1,470.00 108.00 $54.00 2,099.00 $1,049.50 <br />15 SY 490 <br />$0.60 $294.00 108.00 $64.80 598.00 $358.80 <br />16 SY 3580 <br />$7.00 $25,060.00 0.00 $0.00 3,425.00 $23,975.00 <br />17 EA 5 <br />$300.84 $1,504.20 0.00 $0.00 5.00 $1,504.20 <br />18 LF 72 <br />$8.33 $599.76 0.00 $0.00 196.00 $1,632.68 <br />19 SY 793 <br />$5.49 $4,353.57 0.00 $0.00 793.00 $4,353.57 <br />20 SY 38 <br />$12.97 $492.86 0.00 $0.00 130.00 $1,686.10 <br />21 LF 171 <br />$13.14 $2,246.94 0.00 $0.00 176.00 $2,312.64 <br />22 LF 16 <br />$222.87 $3,565.92 0.00 $0.00 16.00 $3,565.92 <br />23 EA 2 <br />$539.15 $1,078.30 0.00 $0.00 2.00 $1,078.30 <br />24 CU YD 6 <br />$270.35 $1,622.10 0.00 $0.00 6.00 $1,622.10 <br />25 LF 16 <br />$25.07 $401.12 0.00 $0.00 0.00 $0.00 <br />26 CU YD 2040 <br />$44.00 $89,760.00 0.00 $0.00 2,040.00 $89,760.00 <br />27 CU YD 80 <br />$37.06 $2,964.80 0.00 $0.00 287.10 $10,639.93 <br />28 CU YD 83 <br />$10.03 $832.49 0.00 $0.00 83.00 $832.49 <br />29 TON 1820 <br />$15.70 $28,574.00 0.00 $0.00 2,029.97 $31,870.53 <br />30 TON 20 <br />$12.67 $253.40 0.00 $0.00 114.00 $1,444.38 <br />31 ROAD STA 45.2 <br />$286.20 $12,936.24 0.00 $0.00 45.20 $12,936.24 <br />32 TON 7 <br />$155.44 $1,088.08 0.00 $0.00 8.08 $1,255.96 <br />33 TON 590 <br />$108.00 $63,720.00 0.00 $0.00 570.50 $61,614.00 <br />34 LF 171 <br />$70.20 $12,004.20 0.00 $0.00 171.00 $12,004.20 <br />35 EA 7 <br />$3,509.76 $24,568.32 0.00 $0.00 7.00 $24,568.32 <br />36 SF 120 <br />$75.21 $9,025.20 0.00 $0.00 120.00 $9,025.20 <br />37 SF 13 <br />$58.16 $756.08 0.00 $0.00 13.00 $756.08 <br />38 EA 6 <br />$255.71 $1,534.26 0.00 $0.00 6.00 $1,534.26 <br />39 LF 113 <br />$2.01 $227.13 0.00 $0.00 120.00 $241.20 <br />TOTAL PART 1 - BASE BID $367,265.96 $524.96 $387,628.54 <br />PART 2 - ALTERNATE (SUNFISH PONDS TRAIL) <br />40 LS 1 <br />$15,000.00 $15,000.00 0.00 $0.00 1.00 $15,000.00 <br />41 LS 1 <br />$952.65 $952.65 0.00 $0.00 1.00 $952.65 <br />42 LF 4080 <br />$1.96 $7,996.80 0.00 $0.00 2,906.00 $5,695.76 <br />43 EA 5 <br />$149.91 $749.55 0.00 $0.00 2.00 $299.82 <br />44 CU YD 400 <br />$21.56 $8,624.00 0.00 $0.00 400.00 $8,624.00 <br />45 EA 3 <br />$0.00 $0.00 0.00 $0.00 0.00 $0.00 <br />46 HOUR 6 <br />$160.45 $962.70 0.00 $0.00 0.00 $0.00 <br />47 SY 4670 <br />$1.00 $4,670.00 0.00 $0.00 4,660.00 $4,660.00 <br />48 SY 4670 <br />$0.50 $2,335.00 0.00 $0.00 4,719.00 $2,359.50 <br />49 LF 16 <br />$8.33 $133.28 0.00 $0.00 94.00 $783.02 <br />50 SY 2370 <br />$3.40 $8,058.00 0.00 $0.00 2,370.00 $8,058.00 <br />51 SY 21 <br />$12.97 $272.37 0.00 $0.00 21.00 $272.37 <br />52 CU YD 1230 <br />$45.00 $55,350.00 0.00 $0.00 1,230.00 $55,350.00 <br />53 CU YD 40 <br />$37.06 $1,482.40 0.00 $0.00 182.90 $6,778.27 <br />54 CU YD 1 <br />$10.03 $10.03 0.00 $0.00 1.00 $10.03 <br />55 TON 1040 <br />$15.70 $16,328.00 0.00 $0.00 1,020.03 $16,014.47 <br />56 ROAD STA 26.1 <br />$286.32 $7,472.95 0.00 $0.00 26.10 $7,472.95 <br />SAWCUT BITUMINOUS OR CONCRETE PAVEMENT <br />CONCRETE PEDESTRIAN RAMP <br />INLET CONTROL <br />EXCAVATION - COMMON (P) <br />SUBGRADE CORRECTION <br />COMMON TOPSOIL BORROW <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />STREET SWEEPER (WITH PICKUP BROOM) <br />EROSION CONTROL BLANKET <br />COMMON EMBANKMENT (CV) (P) <br />AGGREGATE BASE CLASS 6 <br />SUBGRADE PREPARATION <br />REMOVE AND DISPOSE OF EXISTING BITUMINOUS TRAIL PAVEMENT <br />REMOVE AND DISPOSE OF EXISTING BITUMINOUS STREET PAVEMENT <br />SEED MIXTURE 25-131 <br />TRAFFIC CONTROL <br />SILT FENCE <br />EXCAVATION - COMMON (P) <br />COMMON EMBANKMENT (CV) (P) <br />AGGREGATE BASE CLASS 6 <br />SELECT GRANULAR BORROW <br />SUBGRADE CORRECTION <br />TRUNCATED DOME PANELS <br />FURNISH SIGN PANELS <br />INSTALL SIGN PANELS <br />4" BROKEN LINE PAINT - YELLOW <br />MOBILIZATION <br />SUBGRADE PREPARATION <br />BITUMINOUS PATCHING MIXTURE <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) <br />CONCRETE CURB AND GUTTER DESIGN B418 <br />REMOVE AND DISPOSE OF EXISTING CONCRETE CURB & GUTTER <br />15" RCP, CLASS 5 STORM SEWER <br />15" RCP FES W/ TRASH GUARD <br />CLASS III RIPRAP <br />TELEVISE STORM SEWER <br />ITEM DESCRIPTION OF PAY ITEM UNIT <br />CONTRACT THIS PERIOD TOTAL TO DATE <br />MOBILIZATION <br />SAWCUT BITUMINOUS OR CONCRETE PAVEMENT <br />REMOVE AND DISPOSE OF EXISTING BITUMINOUS TRAIL PAVEMENT <br />REMOVE AND DISPOSE OF EXISTING BITUMINOUS STREET PAVEMENT <br />TRAFFIC CONTROL <br />SILT FENCE <br />SALVAGE AND REINSTALL SIGN <br />PART 1 - BASE BID <br />CLEARING <br />GRUBBING <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />STREET SWEEPER (WITH PICKUP BROOM) <br />EROSION CONTROL BLANKET <br />SEED MIXTURE 25-131 <br />INLET CONTROL <br />CLEARING <br />GRUBBING <br />SEED MIXTURE 25-151 <br />SODDING <br />CLEAR BRUSH, TRIM BRANCHES, REMOVE DEADFALL - TAPESTRY/HAMLET TRAIL <br />CONNECTION <br />COMMON TOPSOIL BORROW