Laserfiche WebLink
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024  FOCUSENGINEERING, inc.Option C2: SPRWS Systemwide Delivery with Southern Connection Point (HPZ).Option C2: Recommended for SPRWS system wide delivery. Requires Booster Station PRV andoperational adjustments. It is recommended to construct a dedicated transmission line to theIntermediate Pressure Zone (Water Tower 2).