My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-20 Council meeting -Water Supply Strategies (2)
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
02-20-24
>
2024-02-20 Council meeting -Water Supply Strategies (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 4:03:03 PM
Creation date
8/20/2025 4:02:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024 FOCUSENGINEERING, inc.WATER DISTIRBUTION SYSTEM MODELING FOR NEW WATER SUPPLY SOURCE LOCAITONS1. Adopt a revised Water System Plan to construct and operate a systemwide water supplydelivery system with North Wells (Wells 2, 4 and 5) and South WTP (for Wells 6and 7) –OptionA1.2. Work closely with MDH to test and monitor PFAS at Wells 4 and 5. If PFAS exceedance isdetermined, initiate the design and construction of a centralized Water Treatment Plant to beconstructed at Tana Ridge Park to treat both Well 4 and Well 5. Initiate raw watermain anddistribution system infrastructure improvements recommended forAlternative A2.
The URL can be used to link to this page
Your browser does not support the video tag.