Laserfiche WebLink
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024  FOCUSENGINEERING, inc.WATER DISTIRBUTION SYSTEM MODELING FOR NEW WATER SUPPLY SOURCE LOCAITONS1. Adopt a revised Water System Plan to construct and operate a systemwide water supplydelivery system with North Wells (Wells 2, 4 and 5) and South WTP (for Wells 6and 7) –OptionA1.2. Work closely with MDH to test and monitor PFAS at Wells 4 and 5. If PFAS exceedance isdetermined, initiate the design and construction of a centralized Water Treatment Plant to beconstructed at Tana Ridge Park to treat both Well 4 and Well 5. Initiate raw watermain anddistribution system infrastructure improvements recommended forAlternative A2.