Laserfiche WebLink
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024  FOCUSENGINEERING, inc.A permanent water treatment plant (WTP) and construction of Well 6 at Stonegate Park isfeasible. The full use of the park for recreational purposes will be lost with the exception ofthe playground equipment. The property is city owned.A permanent water treatment plant (WTP) and construction of Well 6 just north of 10th Streetand the Inwood subdivision is feasible. Property will need to be acquired.A ComprehensivePlan Amendment will be required to extend sanitary sewer to the WTP and to revise thezoning from RAD to Public Facilities.The Public Works Facility site resides within the White Bear Lake Court Order 5-mile radiusand is therefore not feasible.Apermanent water treatment plant (WTP) should be constructed with an initial 3,000 to 4,000GPM capacity to serve at least two water supply wells (Well 6 and Well 3 or 7).The treatmentplant should be designed to allow for expansion for 1 additional water supply well and shouldbe designed to meet the projected 2024 Water Supply Demands.It is recommended that the water treatment plant (WTP) be designed to include pretreatmentfor iron and manganese (Fe/Mn).FINDINGSSOUTH AREA WATER TREATMENT PLANT (WTP)