Laserfiche WebLink
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024  FOCUSENGINEERING, inc.1. Secure a MPCA Grant Agreement Amendment to fund design phase engineeringservicesandthe construction of a Test Well and Stonegate Park.2. Initiate Project design and construction phase services.3. Proceed with design phase engineering for Well 6 and a PFAS Water Treatment Plant to belocated in the south part of the city in the high-pressure zone.1. Consider Stonegate Park2. Consider sites north of 10th Street.4. Proceed with detailed site layout and investigations including the construction of a Test Well.5. Consider initiation of a pilot plant study to optimize the WTP design.6. It is recommended that the water treatment plant (WTP) be designed to include pretreatmentfor iron and manganese (Fe/Mn).RECOMMENDATIONSSOUTH AREA WATER TREATMENT PLANT (WTP)