My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-20 Council meeting -Water Supply Strategies (2)
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
02-20-24
>
2024-02-20 Council meeting -Water Supply Strategies (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 4:03:03 PM
Creation date
8/20/2025 4:02:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024 FOCUSENGINEERING, inc.1. Secure a MPCA Grant Agreement Amendment to fund design phase engineeringservicesandthe construction of a Test Well and Stonegate Park.2. Initiate Project design and construction phase services.3. Proceed with design phase engineering for Well 6 and a PFAS Water Treatment Plant to belocated in the south part of the city in the high-pressure zone.1. Consider Stonegate Park2. Consider sites north of 10th Street.4. Proceed with detailed site layout and investigations including the construction of a Test Well.5. Consider initiation of a pilot plant study to optimize the WTP design.6. It is recommended that the water treatment plant (WTP) be designed to include pretreatmentfor iron and manganese (Fe/Mn).RECOMMENDATIONSSOUTH AREA WATER TREATMENT PLANT (WTP)
The URL can be used to link to this page
Your browser does not support the video tag.