My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025 Summer Source
LakeElmo
>
Communications
>
Newsletter - The Source
>
2025 Summer Source
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 11:31:52 AM
Creation date
8/29/2025 11:31:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUBLIC WORKS <br />Page 7The Source | Summer 2025Lakeelmo.gov <br />Coming this fall... <br />Ensuring clean water for residents has always been a top priority, and Lake Elmo provides <br />safe and reliable drinking water that complies with federal and state water quality standards. <br />Since PFAS contaminants were found in our water system, the Lake Elmo Public Works <br />team has worked to reduce and effectively remove pollutants from our drinking water. Well <br />before the Minnesota Department of Health test results exceeded the EPA standard, Wells <br />1 and 2 were proactively taken offline and designated for emergency use only until a <br />solution could be implemented. Well 1 was shut down in 2018 and sealed in 2022. <br />The installation of the new water treatment system at Well 2 is now complete and <br />operational. The process in the new treatment facility is as follows: first, drinking water is <br />pumped from a groundwater source at a depth of 285 feet, drawing from the Prairie Du <br />Chien-Jordan aquifers. The water flows into a small tank, where the first filtration removes <br />larger iron and manganese par ticles. Then, it enters the lead vessel, beginning treatment as <br />water passes through the filtration media. The lower third of this tank contains an ion resin <br />filtration system that removes PFAS. Next, the filtered water moves to the second vessel, <br />which ser ves as the final filtration step before it reaches the distribution system. Finally, <br />Wells 2, 4, and 5 automatically supply clean water to the three water towers as needed. <br />During the filtration process at Well 2, most PFAS chemicals are captured in the first <br />filtration vessel. When that vessel’s contaminant level reaches capacity, staff will direct the <br />pumped water into the second vessel while the resin in the first vessel is replaced. This <br />process takes about one day. In Minnesota, public water supply systems are regularly <br />tested by the Minnesota Depar tment of Health for various contaminants. The water from all <br />three Lake Elmo wells is tested quar terly to ensure it meets health standards. <br />Public works will begin ditch mowing in September and mowing around storm water <br />ponds. <br />New Treatment Facility Brings Well 2 Online
The URL can be used to link to this page
Your browser does not support the video tag.