My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Summer Source
LakeElmo
>
Communications
>
Newsletter - The Source
>
2023 Summer Source
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 11:35:35 AM
Creation date
8/29/2025 11:35:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Thank you to our 2023 Lions Park Sign Sponsors <br />The vintage style signs posted on the outfield fencing at Lions Park help support projects at Lions Park <br />such as backstop improvements and a 45th parallel marker. This year we have 19 new and renewing <br />sponsors: <br /> <br />Aaron Runk – State Farm Insurance Lake Elmo Bank <br />Anita White – Coldwell Banker Lake Elmo Loves Reading <br />Apex Construction, Inc. Lake Elmo Rotary Club <br />Bolton & Menk Nutrition Cave <br />Capra’s Utilities, Inc. Jay Pernue <br />Dan Stoudt, State Farm Insurance ShaneCon, Inc. <br />Hagberg’s Country Market Stilly Spirits, LLC <br />Krinkie Heating & Air Conditioning Stoudt Law, Ltd. <br />Krueger Tree Farm Tiffhanie Zheng – Guardians Real Estate Group <br /> Zignego Agency <br /> <br /> <br />Court Improvement Projects <br />Both Tablyn Park and Pebble Park will receive upgrades to the existing tennis court areas this summer. At <br />Tabyln Park, the two tennis court surfaces will be completely removed and replaced with new playing <br />surfaces. The courts will be striped to accommodate one tennis court and four pickle ball courts. <br /> <br />At Pebble Park, the tennis courts will also be completely <br />renovated and the new surface will be striped to <br />accommodate one tennis court and six pickle ball courts. <br /> <br />Both locations will also see additional updated amenities <br />to include paved trail access, a rebounding wall and <br />benches. The lighting will also be updated to LED with <br />new control boxes that will provide a significant cost <br />savings on electricity. <br /> <br />Work is expected to begin by early July and be complete <br />in October 2023. <br /> Dragon Ladies breast cancer survivors group at Ivywood Park
The URL can be used to link to this page
Your browser does not support the video tag.