My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-2-25 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
9-2-25 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 11:37:19 AM
Creation date
9/2/2025 11:36:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> WORK CHANGE DIRECTIVE <br />STANTEC – ISSUE DATE (SUBMITTAL PHASE) <br />PROJECT NUMBER - PROJECT TITLE PAGE C-940- 1 <br />SECTION C-940 – WORK CHANGE DIRECTIVE 08 <br />Owner: City of Lake Elmo, Minnesota Owner’s Project No.: 2023. 115 <br />Engineer: Stantec Engineer’s Project No.: 173420153 <br />Contractor: Magney Construction Contractor’s Project No.: 616 <br />Project: Well No. 2 Water Treatment Plant <br />Contract <br />Name: <br />Date Issued: 6/27/2025 <br />Effective Date of Work Change <br />Directive: 6/27/2025 <br />Contractor is directed to proceed promptly with the following change(s): <br />Description: <br /> Materials and Labor to paint CMUs at the overhead door <br />Attachments: <br />RFP 008 – OH Door CMU Coatings <br />Purpose for the Work Change Directive: <br />Part of CMUs at the overhead door are exposed to the elements and require coating and <br />painting to preserve their integrity and aesthetics <br />Directive to proceed promptly with the Work described herein, prior to agreeing to change in <br />Contract Price and Contract Time, is issued due to: <br />Notes to User—Check one or both of the following <br />☐ Non-agreement on pricing of proposed change. ☒ Necessity to proceed for schedule or other <br />reasons. <br />Estimated Change in Contract Price and Contract Times (non-binding, preliminary): <br />Contract Price: $ 194.25 increase <br />Contract Time: 0 days No change <br />Basis of estimated change in Contract Price: <br />☒ Lump Sum ☐ Unit Price ☐ Cost of the Work ☐ Other <br /> Recommended by Engineer Authorized by Owner <br />By: Brian Lintgen, Stantec Marty Powers, City of Lake Elmo <br />Title: Project Manager Public Works Director <br />Date: 6/27/2025 6/27/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.