My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-2-25 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
9-2-25 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 11:37:19 AM
Creation date
9/2/2025 11:36:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Project Specifics: <br />• Project is bid for standard wage rates <br />• Project is bid for standard working hours <br />• Project is bid for one phase – 5-6 working days <br />• Additional phases will require remobilization charges not less than $2,500.00 <br />• Foot traffic can resume 24 hours after final coat is installed <br />• Heavy/wheeled traffic can resume 72 hours after final coat is installed <br />• Bid does not include any leveling or filling of low areas in the concrete – “duck <br />ponds” may still exist after the work is completed <br /> <br />Work Site Needs: (Provided by means of the client) <br />Items that need to be removed prior to our arrival <br />• All items from the workspace <br />• Floor to be broom swept (Sweeping Machine is sufficient) <br /> <br />Additional onsite requirements <br />• SwedeBro requires exclusive access to the area for the duration of the project <br />• Dumpster for disposal of project debris. IF a dumpster is not available one can be <br />provided for an additional fee not to exceed $700.00. <br />• Overhead lighting – sufficient to perform work and representative of finished <br />lighting <br />• Temperature controlled environment – Slab temp must be above 60 degrees for <br />48 hours prior to installation <br />• Electrical access – If sufficient power is not available and a generator is needed <br />additional charges will apply <br />o Demo Scope – 220 Three Phase 40 amp or 220 Single Phase 60 amp…we <br />will provide pigtail(s) for hook-up, client provides breakers and panel <br />connection <br />o Installation Scope – Minimum of three 20-amp outlets on separate breakers <br />within 150 feet of the workspace <br />• Access codes/keys, etc. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.