Laserfiche WebLink
<br /> <br /> <br /> Proposal prepared for City of Lake Elmo <br />Shop Floor | Lake Elmo, MN <br />Page 2 of 4 <br /> <br /> <br />Exclusions (unless noted in scope above) <br />· Design and Code Compliance <br />· Engineering/Architectural Design <br />· Permits <br />· Utility/Private Locates <br />· Signage <br />· Unforeseen Below Grade Conditions <br />· Emergency Responder <br />Communication Enhancement <br />System <br />· Hazardous Materials <br />· Material Testing <br />· Special Inspections <br />· Winter Conditions <br />· Temp Enclosures <br />· Electrical <br />· Fire Suppression <br />· Mechanical/HVAC <br />· Plumbing <br />· Irrigation <br />· Security Equipment <br />· Landscaping <br />· Seed/Sod <br /> <br />Clarifications <br />· Work to be performed between Monday and Friday during regular hours <br />· No overtime or weekend work included <br />· This proposal may be withdrawn by Greystone if not accepted within 30 days <br />· Upon acceptance of this proposal, all notations as stated above shall be incorporated as <br />part of the contract documents unless otherwise noted <br />· The attached Terms of Agreement are part of this Proposal <br /> <br />Proposal Prepared By <br /> <br /> <br /> <br /> <br />Christian Mertz, Project Manager <br />Greystone Construction | Facility Solutions Division <br /> <br />Email: CMertz@greystoneconstruction.com <br />Office: 952-278-1136 | Mobile: 612-979-5818 <br /> <br />