My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3-17-25 Parks Commission Meeting Packet
LakeElmo
>
Commissions and Committees
>
6 - Parks Commission
>
02 - Parks Commission Agenda/Packets
>
2025
>
3-17-25 Parks Commission Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 11:47:32 AM
Creation date
9/2/2025 11:47:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br />DATE: 3-17-2025 <br />Motion <br />TO: Parks Commission <br />FROM: Sophia Jensen, Senior City Planner <br />AGENDA ITEM: Inwood 8th/Towns of Inwood Preliminary Plat and PUD <br />REVIEWED BY: Nathan Fuerst, Bolton and Menk Planning Consultant <br /> <br /> <br />BACKGROUND: <br />The City has received a preliminary plat and PUD request from M/I Homes for review of an apartment and <br />attached townhome development. The proposal is for a total of 272 units, split between a 123 unit apartment <br />building and 149 attached townhome units, on roughly 19.3 acres. The site is part of the original Inwood <br />development, North of 5th Street, which was platted in 2014. The site is currently undeveloped but has access <br />to public streets and utilities. This part of the Inwood Development was planned conceptually at the time of <br />the City’s approvals of the Inwood 1st – 5th Additions which contain the single-family part of this master <br />planned area. The remaining undeveloped parcels of Inwood are planned for commercial development. The <br />proposed project requires approval of a comprehensive plan amendment, PUD and plat. <br /> <br />The Inwood development has already satisfied a portion of park dedication for the site. With the 1st addition, <br />10.73 net acres were dedicated as park land (now Ivywood Park). This was over the 9.57 acres required to be <br />dedicated for the project area. This left a park dedication credit of 1.16 acres which was intended to be applied <br />to land South of 5th Street. Below is a breakdown of the credit as it applies to the project area: <br /> <br />19.3 acres total land area for Inwood 8th x 10% park dedication percentage =1.93 acres for park dedication <br />1.93 acres - 1.16 acres of existing credit = 0.77 acres yet to be satisfied for park dedication <br /> <br />ISSUE BEFORE THE PARKS COMMISSION: <br />The Parks Commission is being asked to provide a recommendation on the proposal relating to park land <br />dedication requirements. <br /> <br />GENERAL INFORMATION: <br />• Property Owner: Vadnais Associates LLC <br />• Applicant: M/I Homes <br />• Parcels: 33.029.21.14.0029, 33.029.21.13.0028, 33.029.21.42.0018, and 33.029.21.42.0017 <br />• Site Area: ~19.3 acres <br />• Density: 14.09 units/acre <br />• Land Use Guidance: High Density Residential (HDR) and Mixed Use Commercial (MU-C) <br />• Zoning: High Density Residential (HDR) and Mixed Use Commercial (MU-C) <br />• Surrounding Land Use: The property abuts Inwood Ave and the Lake Elmo Park Reserve to the East, <br />rural residential estate zoning to the North and South, and the City of Oakdale to the West. <br /> <br />PARKS PROPOSAL DETAILS/ANALYSIS: <br />Due to the prior park dedication that has already been provided by the development, the remaining park <br />dedication requirements may be satisfied in one of three options: 1 ) Fee in Lieu of Land (~$93,653) the actual <br />fee will be determined once the development moves into the final plat stage, or 2) 10% of the land area (minus <br />the existing credit = 0.77 acres), or 3) A combination of both. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.