Laserfiche WebLink
PROPOSED 8" DIPPROPOSED 8" SANITARYPROPOSED 15" RCPUPPER 33RD STREET N.DescriptionRev.DateUPPER 33RD STREETTOWNHOUSEDEVELOPMENTLAKE ELMO, MNSheet Title:Project #:Drawn By:Checked By:Issue Date:12226050TJRMJW01.06.233524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2022 Larson Engineering, Inc. All rights reserved.P:\Projects\Projects - 2022\12226050 - Upper 33rd Street Townhouse Development (Element)\C. Design\Drawing Files\12226050 - C100 Demo.dwgLarsonEngineering, Inc.Project Title:ELEMENTDESIGN-BUILD1110 RAYMOUND AVENUE, UNIT 3ST. PAUL, MN 55108Client:Matthew J. Woodruff, P.E.Date: Lic. No.:01.06.23I hereby certify that this plan,specifications or report was preparedby me or under my direct supervisionand that I am a duly licensedProfessional Engineer under the lawsof the state of Minnesota.PRELIMINARY NOT FOR CONSTRUCTION0NORTH51020Sheet:SAWCUT,REMOVE, AND DISPOSE OF EXISTING CONCRETE CURBAND GUTTER.REMOVE AND DISPOSE OF EXISTING TREE, STUMP, AND ROOTS.1DEMOLITION PLANC100KEY NOTESDEMOLITION NOTES1.Verify all existing utility locations.2.It is the responsibility of the Contractor to perform or coordinate allnecessary utility demolitions and relocations from existing utility locationsto all onsite amenities and buildings. These connections include, but arenot limited to, water, sanitary sewer, cable tv, telephone, gas, electric,site lighting, etc.3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) tolocate utilities throughout the area under construction. The Contractorshall retain the services of a private utility locator to locate the privateutilities.4.Sawcut along edges of pavements, sidewalks, and curbs to remain.5.All construction shall be performed in accordance with state and localstandard specifications for construction.2REMOVE AND DISPOSE OF EXISTINGBITUMINOUS PAVEMENT SECTIONSYMBOL LEGEND