Laserfiche WebLink
UPPER 33RD STREET <br />TOWNHOUSE DEVELOPMENT <br /> <br /> <br />STORMWATER CALCULATIONS <br /> <br />BY <br /> <br />LARSON ENGINEERING <br /> <br />NOVEMBER 3, 2022 <br />DECEMBER 28, 2022 <br /> <br /> <br />CONTENTS: <br /> <br />1. Stormwater Runoff Summary <br /> <br />2. Existing Drainage Map <br /> <br />3. HydroCAD Report for Existing Conditions <br />(2-yr, 10-yr, and 100-yr events and 100-yr 10-day snowmelt) <br /> <br />4. Proposed Drainage Map <br /> <br />5. HydroCAD Report for Proposed Conditions <br />(2-yr, 10-yr, and 100-yr events and 100-yr 10-day snowmelt) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> December 28, 2022 <br />T.J. Rose, P.E. Date Registration No.