BASE BID
<br />QUANTITY CO #4 ADJ.UPDATED
<br />QUANTITY UNIT PRICE BASE BID AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT
<br />ITEM DESCRIPTION OF PAY ITEM UNIT
<br />CONTRACT THIS PERIOD TOTAL TO DATE
<br />156 SF 13.29 13.29
<br />$37.00 $491.73 0.00 $0.00 0.00 $0.00
<br />$6,488,157.83 $0.00 $5,497,932.70
<br />TOTALS - BASE CONTRACT $6,488,157.83 $0.00 $5,497,932.70
<br />CHANGE ORDER NO. 1
<br />CO1-1 LS 1 1 $5,950.56 $5,950.56 0.00 $0.00 1.00 $5,950.56
<br />CO1-2 SF -9 -9 $44.00 -$396.00 0.00 $0.00 0.00 $0.00
<br />TOTALS - CHANGE ORDER NO. 1 $5,554.56 $0.00 $5,950.56
<br />CHANGE ORDER NO. 2
<br />CO2-1 CY 200.0 200.0 $19.00 $3,800.00 0.00 $0.00 87.00 $1,653.00
<br />CO2-2 TON 250.0 250.0 $9.00 $2,250.00 0.00 $0.00 0.00 $0.00
<br />CO2-3 LF 545.0 545.0 $86.00 $46,870.00 0.00 $0.00 545.00 $46,870.00
<br />CO2-4 LF -295.0 -295.0 $121.00 -$35,695.00 0.00 $0.00 0.00 $0.00
<br />CO2-5 EA 3.0 3.0 $330.00 $990.00 0.00 $0.00 3.00 $990.00
<br />CO2-6 EA -3.0 -3.0 $800.00 -$2,400.00 0.00 $0.00 0.00 $0.00
<br />CO2-7 EA 9.0 9.0 $750.00 $6,750.00 0.00 $0.00 0.00 $0.00
<br />CO2-8 EA -9.0 -9.0 $770.00 -$6,930.00 0.00 $0.00 0.00 $0.00
<br />CO2-9 LF -11.0 -11.0 $300.00 -$3,300.00 0.00 $0.00 0.00 $0.00
<br />CO2-10 LF -19.4 -19.4 $270.00 -$5,238.00 0.00 $0.00 0.00 $0.00
<br />CO2-11 LF -872.0 -872.0 $610.00 -$531,920.00 0.00 $0.00 0.00 $0.00
<br />CO2-12 LF -718.0 -718.0 $2.00 -$1,436.00 0.00 $0.00 0.00 $0.00
<br />CO2-13 LF 50.0 50.0 $14.50 $725.00 0.00 $0.00 0.00 $0.00
<br />CO2-14 SY 50.0 50.0 $97.00 $4,850.00 0.00 $0.00 38.00 $3,686.00
<br />CO2-15 LS 1.0 1.0 $561,415.00 $561,415.00 0.05 $28,070.75 1.00 $561,415.00
<br />CO2-16 LF 1,190.0 1,190.0 $67.00 $79,730.00 0.00 $0.00 1,190.00 $79,730.00
<br />CO2-17 LS 1.0 1.0 $50,441.00 $50,441.00 0.00 $0.00 1.00 $50,441.00
<br />CO2-18 LF 88.0 88.0 $51.00 $4,488.00 0.00 $0.00 88.00 $4,488.00
<br />CO2-19 LF 295.0 295.0 $34.00 $10,030.00 0.00 $0.00 295.00 $10,030.00
<br />CO2-20 EA 2.0 2.0 $3,940.00 $7,880.00 0.00 $0.00 2.00 $7,880.00
<br />CO2-21 LF 11.0 11.0 $875.00 $9,625.00 0.00 $0.00 11.00 $9,625.00
<br />CO2-22 EA 1.0 1.0 $1,025.00 $1,025.00 0.00 $0.00 1.00 $1,025.00
<br />TOTALS - CHANGE ORDER NO. 2 $203,950.00 $28,070.75 $777,833.00
<br />CHANGE ORDER NO. 3
<br />CO3-1 LS 1.0 1.0 $7,729.75 $7,729.75 0.00 $0.00 1.00 $7,729.75
<br />CO3-2 LS 1.0 1.0 $1,782.50 $1,782.50 0.00 $0.00 1.00 $1,782.50
<br />TOTALS - CHANGE ORDER NO. 3 $9,512.25 $0.00 $9,512.25
<br />CHANGE ORDER NO. 4
<br />CO4-1 EA 2.0 2.0 $1,000.00 $2,000.00 0.00 $0.00 2.00 $2,000.00
<br />CO4-2 LF 335.0 335.0 $112.00 $37,520.00 0.00 $0.00 335.00 $37,520.00
<br />CO4-3 EA 1.0 1.0 $14,950.00 $14,950.00 0.00 $0.00 1.00 $14,950.00
<br />CO4-4 LS 1.0 1.0 $3,125.00 $3,125.00 0.00 $0.00 1.00 $3,125.00
<br />CO4-5 SF 44.0 44.0 $66.00 $2,904.00 0.00 $0.00 39.00 $2,574.00
<br />CO4-6 LS 1.0 1.0 $1,904.00 $1,904.00 0.00 $0.00 1.00 $1,904.00
<br />CO4-7 LS 1.0 1.0 -$171,013.65 -$171,013.65 0.00 $0.00 0.00 $0.00
<br />TOTALS - CHANGE ORDER NO. 4 -$108,610.65 $0.00 $62,073.00
<br />CHANGE ORDER NO. 5
<br />CO5-1 LS 1.0 1.0 $2,162.25 $2,162.25 0.00 $0.00 1.00 $2,162.25
<br />TOTALS - CHANGE ORDER NO. 5 $2,162.25 $0.00 $2,162.25
<br />CHANGE ORDER NO. 6
<br />CO6-1 LS 1.0 1.0 $6,848.05 $6,848.05 0.00 $0.00 1.00 $6,848.05
<br />TOTALS - CHANGE ORDER NO. 6 $6,848.05 $0.00 $6,848.05
<br />CHANGE ORDER NO. 7
<br />CO7-1 LS 1.0 1.0 $2,750.00 $2,750.00 0.00 $0.00 1.00 $2,750.00
<br />TOTALS - CHANGE ORDER NO. 7 $2,750.00 $0.00 $2,750.00
<br />CHANGE ORDER NO. 8
<br />CO8-1 LS 1.0 1.0 $12,783.75 $12,783.75 0.00 $0.00 1.00 $12,783.75
<br />TOTALS - CHANGE ORDER NO. 8 $12,783.75 $0.00 $12,783.75
<br />TOTALS - REVISED CONTRACT $6,623,108.04 $28,070.75 $6,377,845.56
<br />Pump Lift Station
<br />Mobilization and Remove Tree
<br />UPRR Flagging
<br />Install Water Service to 3240 Lake Elmo Ave
<br />Sign Type C
<br />BASE BID
<br />Select Granular Borrow - Mod. 5% (CV) (P) (Bioinfiltration Basin) (FILL AROUND L
<br />Pipe Foundation Rock (UNDER VALVE VAULT - FILL TO SUITABLE SOILS)
<br />8" PVC Pipe Sewer (C900) (DR-25)
<br />14" PVC Pipe Sewer (C900) (DR-25)
<br />8"X4" PVC Wye, C900
<br />14"X4" PVC WYE, C900
<br />6" C-900 DR18 PVC FOREMAIN
<br />PAVEMENT MESSAGE PREFORMED THERMOPLASTIC GROUND IN
<br />TEMPORARY SHORING (AT LIFT STATION)
<br />CONC. EDGE REINFORCING
<br />RESTOCK 14" PVC, C-900
<br />DROP MANHOLES PRODUCED/NOT USED
<br />SANITARY SEWER 14" OUTSIDE DROP
<br />MANHOLE BASE PRODUCED/NOT USED
<br />Saddle Tap for 1.25" HDPE to 8" PVC C900
<br />Saddle Tap for 1.25" HDPE to 14" PVC C900
<br />Sanitary Sewer 8" Outside Drop
<br />Sanitary Sewer Manhole Extra Depth
<br />24" Casing Pipe (Jacked/Augered w/ 15" PVC SDR 26 Carrier Pipe)
<br />Clean and Televise Sanitary Sewer
<br />B618 Concrete Curb & Gutter (AT LIFT STATION)
<br />8" Concrete Driveway Pavement
<br />*CONSTRUCT LIFT STATION
<br />Sanitary Sewer Plug - 34th St / Lake Elmo Avenue
<br />12" RC Pipe Apron w/Trash Guard
<br />8" PVC Pipe Sewer (C900) (DR-25) - Upper 33rd Street
<br />Cut In 16" Butterfly Valve & Box (Incl 16" Sleeve)
<br />Temporary Water Service - Upper 33rd St
<br />Truncated Domes
<br />Locate Water Service at 3442 Lake Elmo Ave
<br />Quantity Changes (Itemization Above)
<br />Replace Watermain on 32nd Street
<br />Remove Leaking Water Valve on 32nd Street
|