My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#12 - Landscape Requirements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
02-21-23
>
#12 - Landscape Requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:05:53 PM
Creation date
9/29/2025 1:05:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure C: Example cross-section of screening between land uses. <br />Figure D: Example elevation view of screening between land uses. <br />7.Maintenance and installation of materials. Installation and maintenance of all landscape materials shall <br />comply with the following standards: <br />1.All landscape materials shall be installed to current industry standards. Special attention must be <br />paid to initial soil preparation, drainage, and proper initial planting of plant root mass. <br />2.Irrigation or other water supply adequate to support the specified plant materials shall be provided <br />at the time of, or immediately after, plant installation. <br />3. All required landscaping and screening features shall be kept free of refuse and debris. <br />4.All landscape plantings, seeded, and sodded areas shall be maintained to manage weeds and ensure <br />establishment of intended plant materials. <br />5.All landscape materials shall be guaranteed for two years. Any landscape material that dies, has a <br />dead or broken central leader, exhibits 30% or more crown death, is damaged by construction, or <br />becomes diseased before the end of the second year after installation shall be replaced by the <br />developer. <br />6. For nonresidential projects, continuing maintenance and replacement of landscape materials shall <br />be the responsibility of the property owner, including after beyond two years of initial installation. <br />Improvements identified on the landscape plan, including non-plant materials, such as fencing, <br />shall be maintained for the life of the project for which the plan was required.
The URL can be used to link to this page
Your browser does not support the video tag.