My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cyphers Logistic Park AUAR 36 March 2022 <br />Identifying Inventory Wetland Type Wetland Classification Identified Wetland Size <br />Freshwater Emergent Wetland PEM1C 48 sq uare feet <br />Freshwater Emergent Wetland PEM1F 0.3 acres <br />Freshwater Emergent Wetland PEM1A 2.4 acres <br />Freshwater Pond PUBFx 0.18 acres <br />Freshwater Pond PABHx 0.08 acres <br />Freshwater Pond PUBHx 0.21 acres <br />Total -- -- 5.2 Acres <br /> <br />c. Other surface waters – Describe any anticipated physical effects or alterations to surface water features (lakes, streams, ponds, intermittent channels, county/judicial ditches) such as draining, filling, permanent inundation, dredging, diking, stream diversion, <br />impoundment, aquatic plant removal, and riparian alteration. Discuss direct and indirect environmental effects from physical modification of water features. Identify measures to <br />avoid, minimize, or mitigate environmental effects to surface water features, including in-water Best Management Practices that are proposed to avoid or minimize <br />turbidity/sedimentation while physically altering the water features. Discuss how the project will change the number or type of watercraft on any water body, including current <br />and projected watercraft usage. <br />AUAR Guidance: Water surface use need only be addressed if the AUAR area would include or adjoin recreational water bodies. <br />No alternations to other surface waters are anticipated as part of any of the development <br />scenarios . <br />d. If the wastewater discharge is to surface water, identify the wastewater treatment <br />methods, discharge points, and proposed effluent limitations to mitigation impacts. Discuss any effects to surface or groundwater from wastewater discharges. <br />No wastewater discharge to existing surface waters is anticipated for any of the development <br />scenarios . <br />e. Stormwater – Describe the quantity and quality of stormwater runoff at the site prior to and post construction. Include the routes and receiving water bodies for runoff from the <br />site (major downstream water bodies as well as the immediate receiving waters). Discuss any environmental effects from stormwater discharges. Describe stormwater pollution <br />prevention plans including temporary and permanent runoff controls and potential Best Management Practices site locations to manage or treat stormwater runoff. Identify <br />specific erosion control, sedimentation control, or stabilization measures to address soil limitations during and after project construction. <br />Scenario s 1, 2, 3 and 4
The URL can be used to link to this page
Your browser does not support the video tag.