Laserfiche WebLink
Cyphers Logistic Park AUAR 56 March 2022 <br />Existing (2021) Conditions <br />• No mitigation necessary <br />Opening Year (2025) No-Build Conditions <br />• No mitigation necessary <br />Opening Year (2025) Build Scenario s 1-4 Conditions <br />• Install eastbound right and westbound left turn lanes on 34th Street N at site access 1 <br />• Side-Street stop control at all accesses <br />Horizon Year (2040) No-Build Conditions <br />• Addition of a southbound left-turn lane at the intersection of Ideal Avenue N & Stillwater <br />Boulevard N <br />• Signal timing modification at the intersection of 34th Street N & Ideal Avenue N <br />Horizon Year (2040) Build Scenario 1 Conditions <br />• All Modifications from Horizon Year (2040) No -Build Conditions <br />• Install eastbound left, eastbound right, westbound left, and westbound right turn lanes on 34th Street N at site access 1 <br />• Side-Street stop control at all accesses <br />• Monitor 34th Street & site access 1 as development continues to determine if a signal is warranted <br />Horizon Year (204 0) Build Scenario 2 Conditions <br />• All Modifications from Horizon Year (2040) No -Build Conditions <br />• Expansion of 34th Street N to a four -lane cross-section at its intersection with Jamaca Avenue <br />N <br />• Monitor the roundabout at 34th Street N & Jamaca Avenue N and add a second circulating <br />lane for the eastbound and westbound movements if necessary <br />• Addition of southbound left-turn lane to site access 1 on 34th Street N <br />• Install eastbound left, eastbound right, westbound left, and westbound right turn lanes on 34th Street N at site access 1 <br />• Monitor 34th Street & site access 1 as development continues to determine if a signal is warranted <br />Horizon Year (2040) Build Scenario 3 Conditions <br />• All Modifications from Horizon Year (2040) No -Build Conditions <br />• Install eastbound left, eastbound right, westbound left, and westbound right turn lanes on 34th <br />Street N at site access 1 <br />• Monitor 34th Street & Site Access 1 as development continues to determine if a signal is warranted <br />Horizon Year (2040) Build Scenario 4 Conditions <br />• All Modifications from Horizon Year (2040) No -Build Conditions