Laserfiche WebLink
Cyphers Logistic Park AUAR 64 March 2022 <br />Resource Area Mitigation <br />Scenario 1, 2, 3, and 4: To avoid impacts to the Least Darter, proper erosion and sediment control practices will be implemented and maintained during <br />construction near wetlands and will be incorporated into a stormwater management plan. <br />Scenario 1, 2, 3, and 4: Invasive species will be controlled during site construction. <br />Scenario 1, 2, 3, and 4: Pollinator friendly seed mixes will be used to promote <br />pollinator habitat. <br />Air <br />Scenario 1, 2, 3, and 4: Construction will generate temporary fugitive dust emissions during construction. These emissions will be controlled by sweeping, <br />watering, sprinkling, as appropriate or as prevailing weather and soil conditions dictate. <br />Noise <br />Scenario 1, 2, 3, and 4: Construction activities may result in temporarily elevated <br />noise levels. The Lake Elmo Code of Ordinances regulates both the hours of operation for construction equipment and allowable noise levels. Construction of <br />the proposed project would comply with these requirements.