My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />25 NorthPoint Industrial Park – Lake Elmo, MN │Traffic Analysis <br />January 2022 <br /> <br />5.7 HORIZON YEAR (2040) BUILD SCENARIO 1 INTERSECTION ANALYSIS <br />The Horizon Year (2040) Build Scenario 1 Condition analysis was completed to develop an understanding <br />of the impact of site traffic on the operating conditions for the study area. The traffic volumes shown in <br />Exhibit 23 were used in the Horizon Year (2040) Build Scenario 1 anal ysis. As previously discussed, these <br />volumes were calculated by adding the Phase 2 o f Scenario 1 trips generated by the site to the Horizon <br />Year (2040) No -Build volumes. The same geometry and intersection control was used as in the Horizon <br />Year (2040) No -Build model (the southbound approach at the intersection of Ideal Avenue N & Stillwater <br />Boulevard N was expanded to three approach lanes and signal timing was optimized at the intersection of <br />34th Street N & Ideal Avenue N). All site accesses were modeled as side street stop, with one exiting lane. <br />Site Access 1 was modeled with left and right turn lanes on 34th Street N due to the high speeds along the <br />corridor. <br />Tables 20 – 21 provide a summary of the average delay (seconds per vehicle) and LOS under Horizon <br />Year (2040) Build Scenario 1 Conditions for each movement at the study intersections during the AM & PM <br />peak hours. The movements that are anticipated to operate at LOS E are shown in yellow and the <br />movements that are anticipated to operate at LOS F are shown in red. The full SimTraffic reports are <br />included in Appendix J. <br />TABLE 20: HORIZON YEAR (2040) BUILD SCENARIO 1 AM LOS SUMMARY <br />Intersection Control Approach <br />Operations by Movement Overall Intersection Left Through Right <br />Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS <br />Ideal Avenue N & <br />34th Street N Signal <br />EB 31.2 C 20.9 C 3.3 A <br />21.6 C WB 33.8 C 24.9 C 3.6 A <br />NB 21.6 C 17.4 B 6.5 A <br />SB 20.0 B 24.0 C 21.1 C <br />Ideal Avenue N & <br />32nd Street N/Site <br />Access 2 <br />Side <br />Street <br />Stop <br />EB 9.8 A - - 3.4 A <br />9.8 A WB - - - - 3.4 A <br />NB 2.5 A 0.5 A 0.3 A <br />SB 6.5 A 5.4 A 4.7 A <br />Ideal Avenue N & <br />31st Street N/Site <br />Access 3 <br />Side <br />Street <br />Stop <br />EB 9.3 A - - 3.5 A <br />9.3 A WB - - - - - - <br />NB 3.2 A 1.8 A 1.6 A <br />SB 2.7 A 0.7 A 0.4 A <br />Ideal Avenue N & <br />Stillwater <br />Boulevard N <br />All - <br />Way <br />Stop <br />EB 7.2 A 11.1 B 2.9 A <br />6.8 A WB 4.6 A 10.9 B 4.0 A <br />NB 6.6 A 10.0 A 2.8 A <br />SB 5.6 A 8.2 A 2.4 A <br />34th Street N & <br />Jamaca Ave nue N <br />Round- <br />about <br />EB 4.4 A 7.4 A 4.1 A <br />7.0 A WB 6.5 A 11.2 B 6.7 A <br />NB 2.7 A 6.4 A 2.2 A <br />SB 2.9 A 6.0 A 1.7 A <br />Ideal Avenue N & <br />36th Street N <br />Side <br />Street <br />Stop <br />EB 8.5 A - - 8.1 A <br />10.5 B WB 10.5 B - - - - <br />NB 3.7 A 1.6 A 1.4 A <br />SB - - 1.2 A 0.1 A <br />34th Street N & <br />Site Access 1 <br />Side <br />Street <br />Stop <br />EB 9.5 A 4.4 A 4.0 A <br />24.1 C WB 3.3 A 0.8 A 0.3 A <br />NB 24.1 C - - - - <br />SB 20.6 C - - 5.6 A
The URL can be used to link to this page
Your browser does not support the video tag.