My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />BARR ENGINEERING CO. Page 3 <br /> <br />• Representative portions of the Property were observed by driving and by foot during the site visit, <br />and some portions of the property were not directly visited beyond viewing from a distance due <br />to the large parcel size. <br />• The above limitations are not considered significant data gaps that affect the ability of the EP to <br />identify RECs on the Property. <br />1.5 Special Terms and Conditions <br />The Assessment was conducted in accordance with an Agreement between Barr and 3M. <br />The scope of the Assessment did not involve the collection and analysis of any type of sample. The <br />Assessment did not involve completion of any surveys or the offering of any opinions or advice with <br />respect to structural engineering matters, asbestos-containing materials, radon, lead-based paint, lead in <br />drinking water, wetlands, compliance with environmental regulations, cultural and historic resources, <br />industrial hygiene, health and safety, ecological resources, endangered species, indoor air quality , <br />biological agents, mold, or other conditions that are beyond the scope of the Practice. <br />Barr has performed its work in a manner consistent with the care and skill ordinarily exercised by <br />members of the environmental profession under similar budget and time constraints. Within this context, <br />Barr assumes responsibility for its own observations, along with its interpretation of the information <br />gathered. No other warranty is made or intended. <br />Because Barr was not retained to verify information, Barr assumes no responsibility for the accuracy of <br />information that it obtained from other sources including, without limitation, regulatory and government <br />agencies, persons interviewed about the Property, and vendors of public data. Performance of the Practice <br />is intended to reduce, but will not eliminate uncertainty regarding the presence of recognized <br />environmental conditions on the Property. To the extent that Barr does not identify recognized <br />environmental conditions on the Property, Barr's opinions in the report are not representations that the <br />Property is free of such conditions. Under no circumstances can Barr represent or warrant that releases of <br />hazardous substances or petroleum products do not exist on the Property. <br />1.6 User Reliance <br />The Assessment has been prepared for the exclusive use of 3M, herein referred to as the “User”. No others <br />may rely on the Assessment without obtaining a formal authorization in the form of a reliance letter from <br />Barr. Barr will provide reliance letters for additional parties only if authorized by the User. <br />
The URL can be used to link to this page
Your browser does not support the video tag.