Laserfiche WebLink
<br /> <br />BARR ENGINEERING CO. Page 7 <br /> <br />Finding ID # Description of Finding Opinion with Respect to Finding (REC, CREC, HREC, de minimis) <br />Finding #5 Pipelines: Two pipelines were documented on the Property. One natural gas pipeline was identified running east to west along the railroad. A petroleum pipeline was identified crossing the Property from northwest to southeast. <br />There are no regulatory listings indicating a release from these pipelines, and there was no staining, <br />stressed vegetation, or other <br />indications of a release observed during the site visit. Therefore, this finding is not a REC. <br />Finding #6 Railroad: The Property includes two parcels that are separated by an active railroad that is present on an adjoining property (see Figure 2). The railroad tracks, ballast bedding, <br />and adjoining ground appeared in good condition and no staining or evidence of a release was observed. There are no regulatory reports of a release related to this railroad property <br />Railroads can be sources of impacts to shallow soils; however, based on the lack of staining or other evidence of <br />releases, this finding is not considered a REC. <br /> <br /> <br />