Laserfiche WebLink
BARR ENGINEERING COMPANY Page A-10 <br />\\barr.com \projects\Mpls\23 MN\82\23821219 3M Lake Elmo Phase Is\WorkFiles\1602921240002\Appendix <br />A\PHIESA_Appendix A_1602921240002.docx <br /> <br />Underground Utility Locations : Underground utilities, including gas, fiber optic and electric, are <br />generally located on the west edge of the parcel, along Ideal Ave. Water utilities and a hydrant are <br />located on the south side of 34 th St, across from Public Works. <br /> <br />Odors: None observed. <br /> <br />Evidence of Use, Production or Disposal of Controlled Substances (as defined by 21 CFR Part <br />802): None observed. <br /> <br /> VIII. Interior and Exterior USTs and ASTs <br />None observed. <br /> <br /> <br />IX. Interviews <br />The objective of interviews is to obtain information indicating recognized environmental condition in <br />connection with the property (ASTM 1527 -13 Sec 10.1). Especially relevant information from the <br />interviews (Refs. 4a, 4b, 4c) is included and documented throughout the Assessment report and <br />Appendix A. <br />