My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - 9450 Hudson Blvd. Development Agreement
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-21-23
>
#05 - 9450 Hudson Blvd. Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:19:29 PM
Creation date
9/29/2025 1:19:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LA515-110-838683.v10 <br /> B. All issues set forth in the City Attorney’s plat opinion letter dated October 26, 2022 <br />must be addressed to the satisfaction of the City Attorney prior to the recording of the <br />final plat. <br /> C. All storm water facilities internal to the site shall be privately owned and maintained. <br />A storm water maintenance and easement agreement in the City’s standard form must <br />be executed by the Developer and recorded with the final plat. <br /> D. That the Developer shall incorporate stormwater reuse for irrigation as approved by <br />the City Engineer. <br /> E. If applicable, the Developer shall provide the City with a copy of written permission <br />from adjacent property owners for any off-site grading work or storm sewer discharges <br />to adjacent properties before starting any work on the Property. <br />F. Before the installation or construction of any subdivision identification signs or <br />neighborhood markers within the Subdivision, the Developer shall submit sign plans <br />to the City for review and obtain a sign permit from the City. <br />27. MISCELLANEOUS. <br /> <br />A. The Developer may not assign this Agreement without the written permission of the <br />City Council. The Developer's obligations hereunder shall continue in full force and <br />effect even if the Developer sells the Subdivision or any portion of it. <br />B. Retaining walls that require a building permit shall be constructed in accordance with <br />plans and specifications prepared by a professional engineer licensed by the State <br />of Minnesota. Following construction, a certification signed by the design engineer <br />shall be filed with the City Engineer evidencing that the retaining wall was <br />constructed in accordance with the approved Plans. All retaining walls identified on <br />the Plans or by special conditions referred to in this Agreement shall be constructed <br />before any other building permit is issued for a lot on which a retaining wall is <br />required to be built.
The URL can be used to link to this page
Your browser does not support the video tag.