Laserfiche WebLink
City Council Meeting <br />March 21, 2023 Page 13 <br /> <br /> <br />City Attorney Review: The City Attorney has reviewed the Covenants and Restrictions for the <br />PUD and finds them acceptable. A plat opinion is required prior to recording of the final plat. A <br />condition has been added. <br /> <br />RECOMMENDED FINDINGS: <br /> <br />Recommended Findings for Preliminary Plat/Preliminary PUD. Staff recommends approval <br />of the Preliminary Plat/Preliminary PUD for PID 34.029.21.44.0006 and 34.029.21.44.0004 <br />based on the following findings: <br />1. That the Preliminary PUD Plan would be consistent with the intent of the 2040 Lake <br />Elmo Comprehensive Plan and the 2040 Land Use Map for this area. <br />2. That the preliminary PUD Plan complies with the general intent of the C- Commercial <br />zoning district with PUD modifications. <br />3. That the preliminary PUD Plan generally complies with the Lake Elmo Design <br />Guidelines and Standards Manual. <br />4. That the preliminary plat generally complies with the City’s Subdivision regulations. <br />5. That the preliminary plat generally complies with the City’s design standards. <br />6. That the preliminary plat generally complies with the City’s Zoning Code with the <br />exceptions provided for in the PUD. <br />7. That the preliminary plat and PUD Plan must be revised to address the comments noted <br />in the City Engineer’s memorandum. <br />8. That the preliminary PUD Plan must be revised to be consistent with City’s landscape <br />plan and tree replacement standards pursuant to the Landscape Architects memo. <br />9. That the preliminary plat and PUD Plan must be revised to address the comments noted <br />in the Fire Department memo. <br />10. That the preliminary PUD Plan meets the minimum requirements for a PUD. <br />11. That the preliminary PUD Plan meets items a, c, d, and i from the identified PUD <br />objectives identified in Section 105.12.1130. Planned unit developments should not be <br />allowed simply for the purpose of increasing overall density or allowing development <br />that otherwise could not be approved. <br />a) Innovation in land development techniques that may be more suitable for a given <br />parcel than conventional approaches. The shared access drive and stormwater ponding <br />areas allow for more efficient use of land. <br />b) Promotion of integrated land uses, allowing for a mixture of residential, commercial, <br />and public facilities. <br />c) Establishment of appropriate transitions between differing land uses. This overall PUD <br />provides a buffer between the interstate highway and residential uses. There are site <br />specific plantings proposed to buffer the adjacent high density residential uses and <br />there is opportunity for future buffering with future uses on the northerly part of the <br />PUD. <br />d) Provision of more adequate, usable, and suitably located open space, recreational