Laserfiche WebLink
City Council Meeting <br />March 21, 2023 Page 15 <br /> <br /> <br />base of all permanent ground signs; provide foot candle measurements or statement to meet <br />the ordinance. <br />4. That the application for final plat and final PUD Plans identify all requests for flexibility <br />from the City Code. <br />5. The applicant shall revise the site plans, utility plans and grading plans to address each <br />review comment and condition of approval to the satisfaction of City staff, as part of the <br />Final Plat application. <br />6. That prior to the City finding any application for final plat and PUD plan complete the <br />applicant shall address all comments in the City Engineer’s memo dated February 28, <br />2023 to the satisfaction of the City Engineer. <br />7. That prior to the City finding any application for final plat and PUD plan complete the <br />applicant shall revise the landscape plan and tree preservation plan in accordance with the <br />City Landscape Architect’s memo dated February 27, 2023 to the satisfaction of the City <br />Landscape Architect. <br />8. That prior to the City finding any application for final plat and PUD plan complete the <br />applicant shall revise the preliminary plat and PUD Plan to address any comments <br />received by Washington County. <br />9. That prior to the City finding any application for final plat and PUD plan complete the <br />applicant shall demonstrate compliance with the items listed in the March 1, 2023, memo <br />from the Fire Department to the satisfaction of the Fire Chief. <br />10. The City Attorney shall issue a plat opinion certifying that the plat, title evidence, and all <br />agreements and documents required under this title meet the requirements of the city <br />prior to City Council review or approval of the final plat. <br />11. The Final Plat/Final PUD shall include all necessary and additional public right-of-way <br />and easements. <br />12. If necessary, the applicant shall provide the City with a copy of written permission for <br />any off-site grading work and storm sewer discharges to adjacent properties before <br />starting any site work, grading and as part of any final plat or final PUD application. <br />13. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting <br />all City standards and design requirements unless specifically addressed otherwise in these <br />conditions. <br />14. The total square feet of buildings on Lots 1, 2, and 3 Block 2 shall not exceed 124,000 sq. <br />feet unless a secondary access is approved by the City. <br />15. Future development of Lots 2-3 Block 2 shall provide a minimum of 25% open space. <br />16. A maximum height of 30 feet shall be required for the future development of Lots 2 and 3, <br />Block 2. <br />17. Setbacks for Block 2 along the shared private drive shall be met as measured from the <br />edge of the shared driveway. All other setbacks shall be that of the C underlying zoning <br />district. <br />18. The future use of Lot 3, Block 2 shall comply with the screening requirements from <br />abutting residential uses to the north. <br />19. For purposes of this PUD and allowed signage, the private driveway shall be considered <br />street frontage. <br />20. All automobile repairs are conducted within an enclosed building and the storage or <br />display of inoperable vehicles or other equipment shall meet all setback requirements of a