Laserfiche WebLink
City Council Meeting <br />March 21, 2023 Page 7 <br /> <br /> <br />Engineering Review. This project has been reviewed by the City Engineer for conformance with <br />the City’s Engineering Design Standards Manual. Detailed comments relating to the review are <br />included in the Engineer’s memo dated February 15, 2023. Ultimately, the City Engineer is <br />recommending approval on the condition that plans be revised to address all City comments. Key <br />comments are summarized below: <br />• Revisions are required to the Preliminary Plat, Grading, Utility, and Landscaping Plans in <br />order to bring them into compliance with City Standards. <br />• Landscaping cannot be placed in area immediately surrounding stormwater ponds. <br />• Sidewalk connection is desired to connect to the Wildflower development to the north at <br />the intersection of Swallowtail Lane and Sunflower Lane. <br />• Streetlight installation required at the site entrance to 39th St. N. <br /> <br />Washington County Review. Stillwater Boulevard is a County road. See attached memo dated <br />February 16, 2023. Comments advised of the possibility of future county road projects that could <br />impact either the ease of access to this parcel or require additional land for public right of way. <br /> <br />Stormwater Management. This property is located within Valley Branch Watershed District. <br />The Developer will be required to follow watershed rules and permitting requirements. <br /> <br />RECOMMENDED FINDINGS: <br /> <br />Recommended Findings for Preliminary Plat/Preliminary PUD. Staff recommends approval <br />of the Preliminary Plat/Preliminary Planned Unit Development (PUD) for PID 13.029.21.21.0009 <br />based on the following findings: <br />1. That the Preliminary PUD Plan is consistent with the intent of the 2040 Lake Elmo <br />Comprehensive Plan and the 2040 Land Use Map for this area. <br />2. That the preliminary PUD Plan complies with the general intent of the Village-Mixed <br />Use zoning district with PUD modifications. <br />3. That the preliminary PUD Plan generally complies with the Lake Elmo Design <br />Guidelines and Standards Manual. <br />4. That the preliminary plat generally complies with the City’s Subdivision regulations. <br />5. That the preliminary plat generally complies with the City’s design standards. <br />6. That the preliminary plat generally complies with the City’s Zoning Code (including <br />Shoreland Zoning) with the exceptions provided for in the PUD. <br />7. That the preliminary PUD Plan meets the minimum requirements for a PUD identified in <br />Section 105.12.1150 and items c, e, g and h from the Identified Objectives for PUDs in <br />Section 105.12.1130 as follows: <br />c. Establishment of appropriate transitions between differing land uses. <br />e. Accommodation of housing of all types with convenient access to employment <br />opportunities and/or commercial facilities; and especially to create additional <br />opportunities for lifecycle housing to all income and age groups. <br />g. Coordination of architectural styles and building forms to achieve greater <br />compatibility within the development and surrounding land uses.