Laserfiche WebLink
Chapter 153 Water Resource Management Adopted 6/28/2022 <br /> Page 12 of 34 <br />(A)Location map. The map shall show the site location with property lines in relation to surrounding roads, <br />other geographic features, buildings and other structures. <br />(B)Topography. <br />(1)Topography showing two-foot contours for the site, invert elevations of existing storm sewer, <br />and/or spot elevations of the conveyance system from drainage discharge points to the nearest <br />receiving waterbody and for a minimum of 100 feet beyond the site boundary. <br />(2)Topography showing ten-foot contours for subwatersheds upstream and downstream of the <br />project site. Where topography in the region is characteristically flat or hydrologic flow path is <br />undetermined, two-foot contours may be required. <br />(C)Vegetation map. In areas where there has been a natural resource or similar inventory, the map shall <br />show the location of trees and vegetation on-site, with identification of those trees and vegetation <br />intended to be retained. <br />(D)Landscape Plan. The plan shall show proposed conditions and shall contain the following: <br />(3)Pervious area identified in square feet or acres; <br />(4)Seed mix(es) or other vegetation type(s) proposed; <br />(5)Note that vegetation must be established to 90% coverage with 100% coverage in areas of <br />concentrated flow. <br />(E)Erosion and Sediment Control Plan. The plan shall have both existing and final proposed conditions <br />drawn to scale, shall be consistent with the manual Protecting Water Quality in Urban Areas (Minnesota <br />Pollution Control Agency, 2000) as revised, and shall include the following: <br />(1)Proposed area of grading or other land-disturbing activities and delineation of the limits of <br />disturbance including areas of grubbing, clearing, tree removal, grading, excavation, fill and <br />other disturbance; <br />(2)Quantity of soil or earth material to be removed, placed, stored or otherwise moved on site; <br />(3)Locations and descriptions of proposed runoff control, erosion prevention, sediment control and <br />temporary and permanent soil stabilization measures; <br />(4)A sequence of land alteration activity and corresponding implementation of erosion control <br />practices, monitoring, maintenance and removal of erosion and sediment control measures; and <br />permanent site stabilization measures. Prior to commencing activity (following all necessary <br />approvals), the responsible party shall provide the SWCD with a construction schedule which <br />will include approximate dates for the following: <br />(a)Completion of installation of perimeter erosion and sediment controls; <br />(b)Completion of required seeding and mulching activities; <br />(c)Completion of land-disturbing activities and putting into place measures for final soil <br />stabilization and re-vegetation; <br />(d)When the site will be permanently stabilized and re-vegetated;