Laserfiche WebLink
City of St. Louis Park TURF ESTABLISHMENT <br />2020 Page 2 of 7 <br />  <br />(3) Thirty percent compost in accordance with 3890, “Grade 2 Compost.” The compost must <br />be source-separated organic material (SSOM) and must be provided by one of the <br />following suppliers. <br /> <br />The Mulch Store SMSC Organic Recycling Facility <br />16454 Blaine Avenue East 1905 Mystic Lake Dr. S. <br />Rosemount, MN 55068 Shakopee, MN 55379 <br />952.946.6999 952.233.9191 <br />902.4 HYDROMULCH (MnDOT Spec. 3884 B.3) <br />Type Stabilized Fiber Matrix (SFM) shall be used for hydroseeding in accordance with <br />MnDOT Specifications Section 3884. <br />902.5 NET FREE EROSION CONTROL BLANKET <br />As part of the boulevard turf reestablishment and to maintain NPDES permit compliance for not <br />having sediment controls along the back of curb, the Contractor may provide a net free erosion <br />control blanket to stabilize the previously applied hydro-mulch, type to be determined by plans or <br />as directed by the Engineer. <br />902.6 OTHER MATERIALS <br />Stakes for holding sod on slopes shall be wood 1 inch X 1/2 inch by 12 inch long and pointed. <br />Where this length of stake does not provide firm bearing, a stake of sufficient length to secure <br />firm bearing shall be used. <br />Commercial fertilizer shall be delivered in original unopened containers with labels indicating the <br />manufacturer, brand name, and chemical analysis intact. <br />903.0 CONSTRUCTION REQUIREMENTS <br />For the following individual work items in addition to the general conditions required by MnDOT <br />standard specifications for construction, individual special items shall apply as indicated. <br />903.1 SEQUENCING AND SCHEDULING <br />Sodding will be performed according to the MnDOT Specifications 2575 and the Inspection and <br />Contract Administration Manual for MnDOT Landscape Projects, 2017 Edition. <br />Seed may be planted during the season of planting appropriate for the particular seed mixture. <br />The season of planting is according to MnDOT Specifications 2575 and the Inspection and <br />Contract Administration Manual for MnDOT Landscape Projects, 2017 Edition. <br />903.1.1 SEEDING AND PLANTING DATES <br />Plant seed mixtures during the seasons of planting for the various seed mixtures in accordance <br />with the following Table: <br />Season of Planting <br />Seed Mixture Number Spring Fall <br />21-112 N/A Aug. 1 - Oct. 1 <br />21-111 May 1 - Aug. 1 N/A <br />22-111, 22-112 April 1 - July 20 July 20 - Oct. 20 <br />25-121, 25-131, 25-141, 25-151 April 1 - June 1 July 20 - Sept. 20