Laserfiche WebLink
EVENT G0210-2000006496 VENDOR INSTRUCTIONS 24 of 24 <br />AMENDMENT #1 FOR 2019 MODELS TA <br />Spec #Description Qty Price Subtotal <br />15.4 Dual 7 pins standard SAE type, end of frame (1) for trailer with <br />electric brakes, (1) for trailer with air brakes 158.00$ -$ <br />15.5 Hand control valve for trailer brakes 47.00$ -$ <br />15.9 1 <br />16.0 MANUALS / TRADE-IN INTEREST FEE:1 <br />16.1 <br />Percent interest per month (non-compounding) on unpaid cab & <br />chassis balance. Applies only to CPV Members. (Payable after <br />trade-in is delivered to vendor). Percentage/per month. 1.50$ -$ <br />SEE Special Terms and Conditions re interest to State <br />agencies. <br />16.2 Manuals in print form, parts repair and service, per set 900.00$ -$ <br />16.3 Manuals in CD form, parts repair and service, per set 500.00$ -$ <br />16.4 Premium Tech Tool 3,200.00$ -$ <br />16.9 1 <br />17.0 Delivery Charges:1 <br />Price per loaded mile Starting Point <br />17.1 Roseville, MN 55113 2.00$ -$ <br />17.9 1 <br />18.0 Maintence/ Body Shop Labor Rates Per Hour 1 <br />18.1 Rate for Initial Inspection/Diagnostoce 148.00$ -$ <br />18.2 Rate for Mechanical Work 148.00$ -$ <br />18.3 Rate for Body Work 148.00$ -$ <br />18.9 1 <br />19.0 Quantity Discounts:1 <br />Enter the number of units that must be purchased and the <br />corresponding discount offered to the purchaser. More than one <br />quantity discount may be entered. <br />20 Next Model Year Upcharges <br />Enter the following Production Model Year here >>>>>>>>>2024 <br />20.1 Percentage Upcharge for the following Model Year: 2023 1 1.50%1,949.40$ <br />20.2 Percentage Upcharge for the following Model Year: 2024 1 1.50%1,949.40$ <br />20.3 2023MY Shipping Surcharge 1 250.00$ 250.00$ <br />20.4 2023MY Material Surcharges 1 7,500.00$ 7,500.00$ <br />20.5 2024MY Material Surcharge 1 4,000.00$ 4,000.00$ <br />Total Cost:145,608.80$