ABSTRACT OF BIDS2023 STREET AND UTILITY IMPROVEMENTSCITY PROJECT NO. 2022.123CITY OF LAKE ELMO, MNBID DATE: APRIL 6, 2022 AT 10:00 AM123456NO.ITEMUNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICEMILLER EXCAVATING, INC.OMG MIDWEST INC. DBA MINNESOTA PAVING & MATERIALST.A. SCHIFSKY & SONS, INC. PARK CONSTRUCTION COMPANYBITUMINOUS ROADWAYS INC. FOREST LAKE CONTRACTING, INC.82 PATCH DOGHOUSE/INVERTEA 3 $338.97 $1,016.91 $370.15 $1,110.45 $386.25 $1,158.75$269.00 $807.00 $301.00 $903.00 $1,500.00 $4,500.0083 REMOVE SEDIMENTEA 7 $338.53 $2,369.71 $179.26 $1,254.82 $309.00 $2,163.00$535.00 $3,745.00 $2,685.00 $18,795.00 $1,500.00 $10,500.0084 ROTATE TOP SLAB OF EXISTING STORM STRUCTUREEA 1 $572.13 $572.13 $624.74 $624.74 $674.65 $674.65 $861.00 $861.00 $481.00 $481.00 $1,500.00 $1,500.0085 SALVAGE AND REINSTALL FLARED END SECTIONEA 1 $572.13 $572.13 $624.74 $624.74 $674.65 $674.65 $942.00 $942.00 $2,375.00 $2,375.00 $2,000.00 $2,000.0086 DITCH GRADINGLF 50 $32.66 $1,633.00 $22.63 $1,131.50 $36.05 $1,802.50 $19.40 $970.00 $95.00 $4,750.00 $40.00 $2,000.0087 CONNECT EXISTING STORM PIPE TO NEW STRUCTUREEA 9 $1,854.43 $16,689.87 $2,024.96 $18,224.64 $2,060.00 $18,540.00 $1,140.00 $10,260.00 $837.00 $7,533.00 $1,000.00 $9,000.0088 CONNECT TO EXISTING HDPE STORM SEWER PIPEEA 1 $815.72 $815.72 $890.72 $890.72 $927.00 $927.00 $1,290.00 $1,290.00 $762.00 $762.00 $1,000.00 $1,000.0089 2' X 3' CATCH BASIN PER DETAIL 404EA 2 $3,411.26 $6,822.52 $4,595.41 $9,190.82 $3,914.00 $7,828.00 $4,180.00 $8,360.00 $2,060.00 $4,120.00 $5,000.00$10,000.0090 4' DIA CBMH WITH CASTING PER DETAIL 406EA 5 $4,439.86 $22,199.30 $5,718.59 $28,592.95 $5,047.00 $25,235.00 $5,160.00 $25,800.00 $3,695.00 $18,475.00 $7,000.00 $35,000.0091 27" DIA CB WITH CASTING PER DETAIL 402EA 1 $2,510.28 $2,510.28 $3,356.86 $3,356.86 $2,884.00 $2,884.00 $2,660.00 $2,660.00 $1,535.00 $1,535.00 $6,000.00$6,000.0092 15" RCP STORM SEWER, CLASS 5LF 51 $111.69 $5,696.19 $121.97 $6,220.47 $133.90 $6,828.90 $85.50 $4,360.50 $91.00 $4,641.00 $125.00 $6,375.0093 10" HDPE STORM SEWERLF 5 $65.95 $329.75 $72.01 $360.05 $77.25 $386.25 $160.00 $800.00 $70.00 $350.00 $125.00 $625.0094 15" RC FLARED END SECTIONEA 2 $1,596.01 $3,192.02 $1,742.78 $3,485.56 $1,957.00 $3,914.00 $1,620.00 $3,240.00 $2,695.00 $5,390.00 $2,400.00$4,800.0095 6" CONCRETE FLUMESF 100 $13.02 $1,302.00 $19.65 $1,965.00 $12.62 $1,262.00 $11.70 $1,170.00 $12.00 $1,200.00 $12.00 $1,200.0096 RIPRAP W/ FABRIC, CLASS IIICY 2 $119.91 $239.82 $130.94 $261.88 $139.05 $278.10 $134.00 $268.00 $125.00 $250.00 $500.00 $1,000.0097 STORM SEWER TELEVISINGLF 56 $4.33 $242.48 $35.10 $1,965.60 $36.05 $2,018.80 $36.10 $2,021.60 $37.00 $2,072.00 $36.00 $2,016.0098 SAWCUT BITUMINOUS PAVEMENTLF 800 $2.18 $1,744.00 $2.67 $2,136.00 $2.47 $1,976.00 $3.05 $2,440.00 $2.00 $1,600.00 $5.00 $4,000.0099 SAWCUT CONCRETE PAVEMENTLF 480 $4.55 $2,184.00 $4.00 $1,920.00 $5.15 $2,472.00 $5.05 $2,424.00 $4.00 $1,920.00 $5.00 $2,400.00100 SALVAGE AND REINSTALL PAVERSSF 20 $141.20 $2,824.00 $15.04 $300.80 $159.65 $3,193.00 $57.80 $1,156.00 $255.00 $5,100.00 $100.00 $2,000.00101 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) SY 4,840 $4.40 $21,296.00 $1.13 $5,469.20 $5.15 $24,926.00 $10.70 $51,788.00 $6.00 $29,040.00 $7.00 $33,880.00102 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (TRAIL) SY 860 $5.49 $4,721.40 $12.58 $10,818.80 $5.15 $4,429.00 $10.70 $9,202.00 $9.00 $7,740.00 $14.00 $12,040.00103 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (SIDEWALK) SY 60 $9.23 $553.80 $13.58 $814.80 $10.30 $618.00 $16.40 $984.00 $16.00 $960.00 $30.00 $1,800.00104 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) SY 250 $9.23 $2,307.50 $13.58 $3,395.00 $10.30 $2,575.00$13.20 $3,300.00 $15.00 $3,750.00 $20.00 $5,000.00105 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTERLF 230 $12.04 $2,769.20 $14.49 $3,332.70 $13.39 $3,079.70 $15.20 $3,496.00 $10.00 $2,300.00 $15.00 $3,450.00106 RECLAIM EXISTING BITUMINOUS AND BASE MATERIALSY 19,600 $1.03 $20,188.00 $3.00 $58,800.00 $4.02 $78,792.00 $0.85 $16,660.00 $2.40 $47,040.00 $3.00 $58,800.00107 SALVAGE AND REINSTALL RECLAIM MATERIAL (CV)CY 130 $34.88 $4,534.40 $16.42 $2,134.60 $39.14 $5,088.20 $29.80 $3,874.00 $37.00 $4,810.00 $40.00 $5,200.00108 HAUL EXCESS RECLAIMED MATERIAL OFF SITE (LV)CY 480 $14.58 $6,998.40 $31.89 $15,307.20 $16.48 $7,910.40$17.20 $8,256.00 $34.00 $16,320.00 $20.00 $9,600.00109 CORE DRILL 4" DRAIN TILE CONNECTION INTO CATCH BASIN EA 22 $1,375.66 $30,264.52 $1,502.16 $33,047.52 $875.50 $19,261.00 $765.00 $16,830.00 $677.00 $14,894.00 $1,000.00 $22,000.00110 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAPLF 2,200 $25.06 $55,132.00 $27.37 $60,214.00 $28.84 $63,448.00 $27.30 $60,060.00 $23.00 $50,600.00 $28.00 $61,600.00111 DRAIN TILE CLEANOUTEA 22 $421.28 $9,268.16 $460.02 $10,120.44 $515.00 $11,330.00 $449.00 $9,878.00 $349.00 $7,678.00 $1,000.00 $22,000.00112 SUBGRADE CORRECTION (EV)CY 870 $24.63 $21,428.10 $30.00 $26,100.00 $27.81 $24,194.70 $42.10 $36,627.00 $47.00 $40,890.00 $40.00 $34,800.00113 SUBGRADE PREPARATION OF RECLAIMED SURFACESY 25,820 $1.13 $29,176.60 $2.09 $53,963.80 $1.29 $33,307.80 $0.97 $25,045.40 $1.00 $25,820.00 $10.00 $258,200.00114 SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) LS 1 $2,949.57 $2,949.57 $1.00 $1.00 $5,150.00 $5,150.00 $4,690.00 $4,690.00 $7,500.00 $7,500.00 $31,000.00 $31,000.00