Laserfiche WebLink
Scope of Improvements <br />New watermain and gravity sanitary sewer extension along 10 th Street from <br />Oak-Land Middle School to Palmer Drive. <br /> <br />01 <br />New 8 -inch forc e main alo ng 10 <br />th Street from Palmer Drive to Lake Elmo <br />Avenue. New 8-inch forc e main connects to new 6 -inc h private line from <br />Lake Elmo Elementary School. Disconnect old 6 -inch forc e main fro m 16 - <br />inch forc e main and abandon old 6 -inc h line in -place. <br />02 <br />03 <br />Construct new manhole over existing gravity sewer at 5th Street, connect <br />ne w 10 -inch forc e main to manhole for discharge. <br />04 <br />Ne w 10 -inch forc e main from public/private connection extending south <br />along Lake Elmo Avenue to 5 th Street.