Laserfiche WebLink
Contractor's Application for Payment <br />Owner's Project No.: <br />Engineer's Project No.: <br />Agency's Project No.: <br />1 From 09/10/25 to 09/30/25 <br />A C D E F F1 F2 G H I J K L <br />Item Quantity Units <br />Unit Price <br />($) <br />Value of Bid Item <br />(C X E) <br />($) <br />Quantity Previous <br />Estimate <br />Value Previous <br />Estimate <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />Value of Work <br />Completed to Date <br />(E X G) <br />($) <br />Contract Information <br />Bid Item <br />No. <br />Application Date:Application Period:Application No.:10/01/25 <br />B <br />% of <br />Value of <br />Item <br /> (J / F) <br />(%) <br />Balance to Finish <br />(F - J) <br />($)Description <br />Work Completed <br />Materials Currently <br />Stored (not in G) <br />($) <br />Work <br />Completed <br />and Materials <br />Stored to Date <br />(H + I) <br />($) <br />Progress Estimate - Unit Price Work <br />City of Lake Elmo <br />Bolton & Menk, Inc. <br />A-1 Excavating LLC <br />I-94 Lift Station Forcemain Replacement <br />Owner: <br />24X.138495 <br />138495 <br />Engineer: <br />Contractor: <br />Project: <br />Contract: <br />Previous Estimate <br />50 550.00 SY 3.00 1,650.00 - - - - 1,650.00 <br />51 10.00 HR 200.00 2,000.00 - - - - 2,000.00 <br />52 680.00 LF 3.00 2,040.00 - - - - 2,040.00 <br />53 240.00 LF 5.00 1,200.00 - - - - 1,200.00 <br />54 31.00 SF 33.00 1,023.00 - - - - 1,023.00 <br />55 12.00 HR 400.00 4,800.00 - 6.00 2,400.00 2,400.00 50% 2,400.00 <br />56 1.00 LS 3,000.00 3,000.00 - 1.00 3,000.00 3,000.00 100% - <br />57 1.00 LS 34,000.00 34,000.00 - - - - 34,000.00 <br />58 140.00 LF 454.00 63,560.00 - - - - 63,560.00 <br />1,248,683.00$ -$ 489,800.00$ -$ 489,800.00$ 39%758,883.00$ BASE BID TOTAL <br />LOCATE EXISTING FORCEMAIN <br />LOCATE EXISTING CASING - INWOOD AVENUE <br />TEMPORARY BYPASS - INWOOD AVENUE <br />REMOVE AND REPLACE FORCEMAIN IN EXISTING CASING <br />SEED MIXTURE MI & HYDRAULIC MATRIX MULCH <br />STREET SWEEPER WITH PICK UP BROOM <br />4" SOLID LINE MULTI-COMPONENT - WHITE <br />4" DOUBLE SOLID LINE MULTI-COMPONENT - YELLOW <br />PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND <br />Unit Price <br />EJCDC C-620 Contractor's Application for Payment <br />(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.2 of 2