Laserfiche WebLink
Report Recommendations <br />Geotechnical investigation supports reclamation of the existing roadways <br />to improve the streets.01 <br />Reconstruction of streets to match existing, widths and geometrics, minor <br />grade adjustments as necessary.02 <br />03 <br />Exis ting public wate rmain s e rve s all prope rtie s within the proje c t are a <br />and no improvements are recommended at this time. <br />04 Posting of No Parking restrictions around cul-de -sac ends. <br />Reconstruction of the streets should include new concrete curb and gutter to <br />improve drainage and maximize the lifecycle of the streets. <br />All streets in the project area are outside of the MUSA boundaries and are <br />served by private wastewater treatment systems, no sanitary sewer <br />extensions are proposed as part of the project. <br />05 <br />06 <br />Replacement of storm sewer structures and pipe as identified, installation <br />of draintile , cleaning of lines and ends, and ditch grading. <br />07