Laserfiche WebLink
Insights on the Study Site <br />•Site is owned outright by the City (no debt) <br />•It is a gateway to the rest of the city <br />•Topography will require significant grading <br />•Rail line separates P1 and P2 <br />•Sewer in place on P1; sewer to P2 needs to go <br />under rail lines; P3 would go under 34th Street <br />•Southern site (P1) has significant grade drop <br />and watershed constraints <br />•Public Works is consuming the area’s <br />premiere commercial corner on P3 <br />•Existing residential around P3 needs <br />consideration <br />Broker Notes <br />•Need to know constraints, City requirements <br />(zoning, utilities, due diligence, access, special <br />uses/trails/City buildings) <br />•Need to know process and timeline for <br />approvals <br />•Retail across the intersection in Oakdale has <br />struggled <br />•Access points will be important as will speed <br />to market <br />•Good roadway connectivity <br />•Heavy industrial could work <br />•Office only makes sense with tenant in hand <br />•Keep options open and don’t divide the site <br />•Help brokers get familiar with the site