Laserfiche WebLink
Recommended Conditions of Approval (9) <br />Condition #5 – <br />The engineering memo addresses <br />concerns related to utilities to the site <br />and how they will connect to the site to <br />the east. The drainage and utility <br />easement is required to ensure <br />flexibility for any future development to <br />the east. The easement is over the <br />parking area and shall include the <br />existing water and sewer stubs which <br />result in an easement that extends <br />over the north side of the property.