My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-02-2025 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
12-02-2025 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 11:08:34 AM
Creation date
12/19/2025 11:05:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 13, 2025 Proposal 10002208_001 <br />c/o Mike Rusenovich <br />City of Lake Elmo <br />3880 Laverne Ave N <br />Lake Elmo, MN 55042 <br />Re: Revised Proposal for a Geotechnical Evaluation <br />CSAH 14 Watermain Improvements, City Project No. 25X.140463 <br />Stillwater Boulevard Between Layton Avenue North and Lake Elmo Avenue North <br />Lake Elmo, Minnesota <br />Dear M r. Rusenovich : <br />Braun Intertec Corporation (Braun Intertec) submits this revised proposal to complete a geotechnical <br />evaluation for the CSAH 14 Watermain Improvements, City Project No. 25X.140463 at the referenced site. <br />Project Information <br />Per the RFP provided by the City of Lake Elmo (City) and dated October 30, 2025, we understand the <br />proposed project will include the construction of a new approximately 1,900 linear feet HDPE watermain <br />beneath Stillwater Boulevard N (CSAH 14) between Layton Avenue N and Lake Elmo Avenue N. The <br />watermain is anticipated to be installed using horizontal directional drilling (HDD) technique. <br />Purpose <br />The purpose of our geotechnical evaluation will be to characterize subsurface geologic conditions at <br />selected exploration locations, evaluate their impact on the project, and provide geotechnical <br />recommendations for the design and construction of the proposed watermain construction. <br />Scope of Services <br />We propose the following tasks to help achieve the stated purpose. If we encounter unfavorable or <br />unforeseen conditions during the completion of our tasks that lead us to recommend an expanded scope of <br />services, we will contact you to discuss the conditions before resuming our services. <br />Site Access <br />Based on aerial photographs, it appears that the site is accessible to a truck-mounted drill rig. We assume <br />there will be no cause for delays in accessing the exploration locations. We are not including debris or <br />obstruction removal, grading of navigable paths, or snow plowing to access the boring locations.
The URL can be used to link to this page
Your browser does not support the video tag.