Laserfiche WebLink
City of Lake Elmo <br />CSAH 14 Watermain Improvements, City Project No. 25X.140463 <br />Revision 1.0 <br />Proposal 10002208_001 <br />November 13, 2025 <br />Braun Intertec Page 5 <br />▪ Recommendations for preparing utility and pavement subgrades, and the selection, placement, and <br />compaction of fill. <br />▪ Recommendations for the design and construction of the proposed watermain using HDD techniques. <br /> <br />We will only submit an electronic copy of our report to you unless you request otherwise. <br /> <br />Schedule <br /> <br />We anticipate performing our work according to the following schedule. <br /> <br />▪ Drill rig mobilization – within about 6 weeks following receipt of written authorization. The anticipated <br />mobilization date is December 17, 2025 provided authorization is received on or before to <br />December 10, 2025. <br />▪ Field exploration – 1 day on site to complete the work. <br />▪ Classification and laboratory testing – within 1 to 2 weeks after completion of field exploration. <br />▪ Preliminary results – within 1 week after completion of field exploration. <br />▪ Report submittal – within about 2 weeks after completion of field exploration. <br /> <br />If we cannot complete our proposed scope of services according to this schedule due to circumstances <br />beyond our control, we may need to revise this proposal prior to completing the remaining tasks. <br /> <br />Fees <br /> <br />We will furnish the services described in this proposal for a lump sum fee of $11,966 <br /> <br />Table 2 provides a breakdown of the proposed fees. <br /> <br />Table 2. Proposed Fee Breakdown <br />Service Fee <br />Site Layout and Utility Clearance $ 984 <br />Permit $ 500 <br />Subcontractor- Traffic Control $ 2,500 <br />Pavement Coring $ 1,120 <br />Drilling Services $ 3,440 <br />Laboratory Testing $ 842 <br />Coordination, Engineering Analysis, and Report $ 2,580 <br />Total $ 11,966 <br /> <br /> <br />Our work may extend over several invoicing periods. As such, we will submit partial progress invoices for <br />work we perform during each invoicing period.