Laserfiche WebLink
Public Works <br />Vehicles & Equipment <br />Vehicle and equipment acquisitions—funded through the Vehicle <br />Replacement, General, and Water funds plus vehicle and <br />equipment trade-ins or sales—are reviewed annually for potential <br />replacement. <br />2026-2035 -- 30 Projects totaling $3,803,799 <br />Major Expenditures for 2026 – 2027 <br />•New utility vehicle for 2 new hires <br />•Replace 20-year-old radios <br />•Replace a 1999 Loader <br />•Replace a 2015 Dump Truck