Laserfiche WebLink
Stormwater <br />Improvements, replacements and major repairs for existing <br />stormwater infrastructure —funded through the Stormwater Fund— <br />are reviewed annually by Engineering and Public Works. <br />•Flood control <br />•Pond maintenance / Sediment removal <br />•2026-2035 -- 6 Projects totaling $1,530,405 <br />Major Expenditures for 2026 – 2027 <br />•Phase 2 Improvements: Northstar Pond Oversize <br />•Storm Sewer system improvements pending inspections