Laserfiche WebLink
Stillwater <br />Blvd <br />(CSAH <br />14) <br />Watermain <br />Improvement <br />2026 thru 2035 <br />Infrastructure - Water - Detail <br />Lake Elmo, MN <br />Project #W-123 <br />Project Name Stillwater Blvd (CSAH 14) Watermain Improvement <br />Contact Engineer Department Water Department <br />Category Water Priority 4 Less Important <br />Status New Recommendation Useful Life 40 years <br />Old Project Number W-038 <br />Description <br />The segment of watermain along Stillwater Boulevard (CSAH 14), from the north leg of Lake Elmo Avenue (CSAH 17) to Layton Avenue, has experienced significant signs of aging and fatigue, resulting in 7 watermain breaks in the <br />past 6 years with 5 of those breaks occurring the past 3 years. The pipe segment was originally constructed with the Old Village water system in the mid 1960’s and is now beyond its useful service life. <br />Justification <br />Strategic watermain pipe lines that are needed as part of the water distribution system for adequate and reliable water delivery and pressures throughout the city. Trunk watermains are identified through the city's water distribution <br />system modeling program. <br />Expenditures 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total <br />Construction/Maintenance 1,500,000 0 0 0 0 0 0 0 0 0 1,500,000 <br />Total 1,500,000 0 0 0 0 0 0 0 0 0 1,500,000 <br />Funding Sources 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total <br />Water Fund 1,500,000 0 0 0 0 0 0 0 0 0 1,500,000 <br />Total 1,500,000 0 0 0 0 0 0 0 0 0 1,500,000 <br />Produced Using Plan-It CIP Software