Laserfiche WebLink
Proposed Improvements <br />Reconstruction of the streets to match existing widths and geometrics, <br />minor grade adjustments will be made as necessary.01 <br />The existing bituminous roadways and underlying aggregate base material is <br />suitable for Full-Depth Reclaim (FDR), this method will be used.02 <br />03 <br />Exis ting public wate rmain s e rve s all prope rtie s within the proje c t are a <br />and no improvements are recommended at this time. <br />04 Posting of No Parking restrictions around cul-de -sac ends. <br />Reconstruction of the streets will include new concrete curb and gutter to <br />improve drainage and maximize the lifecycle of the streets. <br />All streets in the project area are outside of the MUSA boundaries and are <br />served by private wastewater treatment systems, no sanitary sewer <br />extensions are proposed as part of the project. <br />05 <br />06 <br />Replacement of storm sewer structures and pipe as identified in the plans, <br />ins tallation of draintile , cleaning of lines and ends, and ditch grading. <br />07