My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-26 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2026
>
04-07-26 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 10:21:36 AM
Creation date
4/7/2026 10:15:20 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUD Flexibilities <br />This project is requesting three flexibilities via the OP-PUD: <br />Architectural Standards (60% Garage Façade) – Per LEC 105.12.1060(c) the width of an attached <br />garage shall not exceed 40% of the building façade. The Applicant is requesting a blanket flexibility <br />over all lots to go up to 60% garage façade. The reason for this request is to meet the residents’ <br />expectations of interior storage and functionality of the home. Staff find this request reasonable. <br />Concrete vs. Bituminous Sidewalk – Per LEC 105.12.1060(f) a traditional sidewalk is to be constructed <br />along the roadway. The applicant is proposing to construct an 8-foot wide bituminous ‘sidewalk’ <br />along the roadway in addition to the existing trail requirements/standards. The reason for this request <br />is for a contiguous trail system throughout the development and allow for a wider section for <br />pedestrians/bikers. The applicant is proposing the HOA maintain the sidewalk and trails. Staff find this <br />request reasonable. <br />30% vs 40% Impervious – Per LEC 105.12.1060(e) the maximum impervious surface per lot is 30%. The <br />applicant is proposing a blanket approval of 40% impervious surface per lot. The reason behind this is <br />due to unique lot shapes and the amenities that the residents expect. Across the entire development <br />site, impervious surface will be ~19%, this meets the previous standard for overall development. Staff <br />finds this request reasonable.
The URL can be used to link to this page
Your browser does not support the video tag.