My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-26 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2026
>
04-07-26 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 10:21:36 AM
Creation date
4/7/2026 10:15:20 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L A K E E L M O A N N U A L R E P O R T | 2 0 2 5 22 <br />Engineering <br />2026 Priorities - Engineeering <br />Continue engineering support for private <br />subdivision implementation including Limerick <br />Village, Highpoint Crossing, Granvia Preserve, <br />Inwood Commercial, Inwood Townhomes, <br />Northstar 3rd Additon, Bridgewater Village, and <br />existing construction projects <br />Complete the site acquisition, the construction <br />of a new water supply well (Well 6) and the <br />design of the South Water Treatment Plant. <br />Complete the Siting Study for the North Water <br />Treatment Plant for Wells 4 and 5. <br />Provide engineering support for the 2050 <br />Comprehensive Plan, including Water Supply <br />Plan, Wastewater Plan, Transportation Plan and <br />Surface Water Plan. <br />Complete the 2026 Capital Improvement Plan <br />projects, including the CSAH 14 Watermain <br />Replacement and 2026 neighborhood street <br />improvements. <br />Provide support for the City’s MS4 Program, <br />including permit updates required by the new <br />MPCA 2026 MS4 General Permit reissuance. <br />Coordinate with Washington County and MnDOT <br />on the TH36/CSAH17 Interchange and South <br />Frontage Project, assisting with overseeing <br />project construction. <br />2025 Highlights - Engineering <br />Implemented a new ArcGIS system for thecity with public-facing applications for landuse, public utilities, parks, and trailsThe Well 2 PFAS Water Treatment Plant wascompleted and placed into operation priorto peak summer water use, and the MPCA3M Operations and Maintenance Grant wassecuredThe I-94 Lift Station upgrade and forcemainreplacement were completed to secureadditional sanitary sewer capacityImplemented an expedited project deliveryin support of the school district to providepublic sewer and water to the new LakeElmo Elementary School, and to connect theOak-Land Middle SchoolCompleted the 2025 Capital ImprovementPlan (CIP) projects, including the VillageParkway Union Pacific Railroad (UPPR)Crossing Improvements, 2025 neighborhoodStreet Improvements, demolition of WaterTower No. 1, and parking lot improvementsat Reid ParkCompleted city-wide street conditionassessments, updated the PavementManagement Plan, and implemented the2025 seal coat and crack sealing projectsObtained new MPCA 3M Grant Agreementsfor preliminary engineering work for a newwater supply well, the South WaterTreatment Plant, and North Water TreatmentPlantProvided city coordination and engineeringreview for County led projects including theTH36/CSAH17 Interchange and SouthFrontage, and the CSAH 13 (Inwood Avenue)and CSAH 15 (Manning Avenue) PavementRehabilitation
The URL can be used to link to this page
Your browser does not support the video tag.